Lean manufacturing in the production of sprockets through value stream mapping – a case study

During the last two decades, researchers and practitioners have carried out investigations on implementing lean manufacturing by applying value stream mapping (VSM) technique along the production lines of different automobile parts. Although being a part produced in large volume in automobile industry, sprocket has not been subjected to such investigation. In order to fill this gap, the case study reported in this paper was carried out. Initially, the production of a sprocket in the case study company was observed. Subsequently, the current and future state maps were drawn. In order to decrease the total lead time, two lean manufacturing approaches were specified in this future state map. On implementing these two lean manufacturing approaches, the total lead time decreased from 82.848 seconds to 70.568 seconds. The experience of conducting this case study indicated that VSM is a powerful technique for practically implementing lean manufacturing in organisations.

Authors

Institutions

Publication Details

Journal
International Journal of Productivity and Quality Management
Published
2025-01-01
DOI
https://doi.org/10.1504/ijpqm.2025.147829
Primary Topic
Quality and Supply Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Lean manufacturing in the production of sprockets through value stream mapping – a case study

Dhananjay Kumar, S.R. Devadasan
International Journal of Productivity and Quality Management
Quality and Supply Management
article

Lean manufacturing in the production of sprockets through value stream mapping – a case study

Dhananjay Kumar, S.R. Devadasan
article en

Abstract

During the last two decades, researchers and practitioners have carried out investigations on implementing lean manufacturing by applying value stream mapping (VSM) technique along the production lines of different automobile parts. Although being a part produced in large volume in automobile industry, sprocket has not been subjected to such investigation. In order to fill this gap, the case study reported in this paper was carried out. Initially, the production of a sprocket in the case study company was observed. Subsequently, the current and future state maps were drawn. In order to decrease the total lead time, two lean manufacturing approaches were specified in this future state map. On implementing these two lean manufacturing approaches, the total lead time decreased from 82.848 seconds to 70.568 seconds. The experience of conducting this case study indicated that VSM is a powerful technique for practically implementing lean manufacturing in organisations.

International Journal of Productivity and Quality ManagementVol. 45(3)
Karunya University (IN), PSG INSTITUTE OF TECHNOLOGY AND APPLIED RESEARCH (IN), KPR Institute of Engineering and Technology (IN)
Openalex Percentile: Top 67%
Quality and Supply Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Lean manufacturing in the production of sprockets through value stream mapping – a case study — Dhananjay Kumar, S.R. Devadasan · International Journal of Productivity and Quality Management (2025) | TGRS Research Map | TGRS