Fishbone Analysis of Human Error and Risk Control in High-Risk Construction Projects (Case Study: Biodiesel Project, South Kalimantan)

Workplace accidents continue to be a significant concern in the construction industry, particularly in high-risk activities such as working at height. This study aims to identify hazards and analyze the root causes of human error using the Hazard Identification, Risk Assessment, and Risk Control (HIRARC) and Fishbone Analysis approaches. The research uses a qualitative descriptive method, incorporating interviews, project photo/video observations, and document analysis to gather data. The findings reveal that the main contributing factors to human error include environmental conditions, human behavior, and work methods. Based on these findings, recommendations focus on enhancing supervision, implementing continuous safety training programs, ensuring the availability of ergonomic Personal Protective Equipment (PPE), and developing simple and effective work procedures. Fishbone Analysis proved to be an effective tool for identifying root causes and assisting in the development of a structured risk control strategy. The implications of this research emphasize the importance of a holistic approach to risk management, incorporating both technical and human factors to improve safety standards in construction projects.

Authors

Institutions

Publication Details

Journal
Journal Research of Social Science Economics and Management
Published
2025-08-04
DOI
https://doi.org/10.59141/jrssem.v5i1.947
Primary Topic
Occupational Health and Safety Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Fishbone Analysis of Human Error and Risk Control in High-Risk Construction Projects (Case Study: Biodiesel Project, South Kalimantan)

Shine Pintor Siolemba Patiro, Dwi Iin Novianti, Rini Yayuk Priyati
Journal Research of Social Science Economics and Management
Occupational Health and Safety Research
article

Fishbone Analysis of Human Error and Risk Control in High-Risk Construction Projects (Case Study: Biodiesel Project, South Kalimantan)

Shine Pintor Siolemba Patiro, Dwi Iin Novianti, Rini Yayuk Priyati
article en

Abstract

Workplace accidents continue to be a significant concern in the construction industry, particularly in high-risk activities such as working at height. This study aims to identify hazards and analyze the root causes of human error using the Hazard Identification, Risk Assessment, and Risk Control (HIRARC) and Fishbone Analysis approaches. The research uses a qualitative descriptive method, incorporating interviews, project photo/video observations, and document analysis to gather data. The findings reveal that the main contributing factors to human error include environmental conditions, human behavior, and work methods. Based on these findings, recommendations focus on enhancing supervision, implementing continuous safety training programs, ensuring the availability of ergonomic Personal Protective Equipment (PPE), and developing simple and effective work procedures. Fishbone Analysis proved to be an effective tool for identifying root causes and assisting in the development of a structured risk control strategy. The implications of this research emphasize the importance of a holistic approach to risk management, incorporating both technical and human factors to improve safety standards in construction projects.

Journal Research of Social Science Economics and ManagementVol. 5(1)
Indonesia Open University (ID)
Openalex Percentile: Top 72%
Occupational Health and Safety Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.