Efficiency Improvement in The Electrical Accessories Production Line Using Lean Strategies

This case study objective is to improve efficiency in electrical accessories production line using Lean tools particularly Single Minute Exchange of Die. Single Minute Exchange of Die denotes principles, methodologies employed to minimize equipment setup durations. Single Minute Exchange of die aims to achieve setup times of under ten minutes, specifically a single-digit number of minutes. More internal setup and changeover time. Impacted stake holders in the organization due to the above challenges are Production, Logistics, Finance and Supply chain sectors. This case study focuses on reduction of the changeover time in manufacturing line to satisfy client needs on time. Digital concepts have not touched upon through SMED. This can be adopted for the changeover reduction in the process followed in shopfloor. Through this case study, Lean implementation hourly rate improvement and capacity increased, industrial efficiency improved, change over time reduced, movement waste drastically reduced. All Customer orders were secured within short span of time. Setup time has been optimized to a greater extent in electrical accessories production line.

Authors

Institutions

Publication Details

Journal
International Research Journal on Advanced Engineering and Management (IRJAEM)
Published
2025-08-04
DOI
https://doi.org/10.47392/irjaem.2025.0415
Primary Topic
Quality and Supply Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Efficiency Improvement in The Electrical Accessories Production Line Using Lean Strategies

P.K. Rajan, A Maragathamuthu
International Research Journal on Advanced Engineering and Management (IRJAEM)
Quality and Supply Management
article

Efficiency Improvement in The Electrical Accessories Production Line Using Lean Strategies

P.K. Rajan, A Maragathamuthu
article en

Abstract

This case study objective is to improve efficiency in electrical accessories production line using Lean tools particularly Single Minute Exchange of Die. Single Minute Exchange of Die denotes principles, methodologies employed to minimize equipment setup durations. Single Minute Exchange of die aims to achieve setup times of under ten minutes, specifically a single-digit number of minutes. More internal setup and changeover time. Impacted stake holders in the organization due to the above challenges are Production, Logistics, Finance and Supply chain sectors. This case study focuses on reduction of the changeover time in manufacturing line to satisfy client needs on time. Digital concepts have not touched upon through SMED. This can be adopted for the changeover reduction in the process followed in shopfloor. Through this case study, Lean implementation hourly rate improvement and capacity increased, industrial efficiency improved, change over time reduced, movement waste drastically reduced. All Customer orders were secured within short span of time. Setup time has been optimized to a greater extent in electrical accessories production line.

International Research Journal on Advanced Engineering and Management (IRJAEM)Vol. 3(08)
Tamil University (IN), Madurai Kamaraj University (IN)
Openalex Percentile: Top 67%
Quality and Supply Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.