Possibilities of Increasing the Efficiency of Production Systems by Using an Additional Capacitive Element

Abstract The continuity of the flow of materials needed for correct operation of manufacturing systems can be achieved using different means and control methods. These objectives can be achieved through the use of Total Productive Maintenance (TPM). Specific effects can also be achieved by using additional capacitive elements in device systems (manufacturing lines). In this paper to be considered is a system with a serial structure and an additional capacitive element (the position within the system and the capacity of the element are determined). The capacitive element divides the system into two subsystems: the part delivering the material to the buffer (DP) and the part receiving the material (RP). The time lost due to unplanned interruptions in the operation of the production system equipment is described by the MTTR (Mean Time to Repair) indicator. The analysis of the system’s operation used the failure index, which is directly related to the MTTR index. To study the system, a method involving the analysis of states and a digital simulation are used. To assess the system with an additional capacitive, a production performance indicator is used. The obtained results allow for conclusions on the possibilities for improving the effectiveness of manufacturing systems using the proposed method.

Authors

Institutions

Publication Details

Journal
Management Systems in Production Engineering
Published
2025-08-04
DOI
https://doi.org/10.2478/mspe-2025-0038
Primary Topic
Manufacturing Process and Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Possibilities of Increasing the Efficiency of Production Systems by Using an Additional Capacitive Element

Edward Michlowicz
Management Systems in Production Engineering
Manufacturing Process and Optimization
article

Possibilities of Increasing the Efficiency of Production Systems by Using an Additional Capacitive Element

Edward Michlowicz
article en

Abstract

Abstract The continuity of the flow of materials needed for correct operation of manufacturing systems can be achieved using different means and control methods. These objectives can be achieved through the use of Total Productive Maintenance (TPM). Specific effects can also be achieved by using additional capacitive elements in device systems (manufacturing lines). In this paper to be considered is a system with a serial structure and an additional capacitive element (the position within the system and the capacity of the element are determined). The capacitive element divides the system into two subsystems: the part delivering the material to the buffer (DP) and the part receiving the material (RP). The time lost due to unplanned interruptions in the operation of the production system equipment is described by the MTTR (Mean Time to Repair) indicator. The analysis of the system’s operation used the failure index, which is directly related to the MTTR index. To study the system, a method involving the analysis of states and a digital simulation are used. To assess the system with an additional capacitive, a production performance indicator is used. The obtained results allow for conclusions on the possibilities for improving the effectiveness of manufacturing systems using the proposed method.

Management Systems in Production EngineeringVol. 33(3)
AGH University of Krakow (PL)
Openalex Percentile: Top 73%
Manufacturing Process and Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Possibilities of Increasing the Efficiency of Production Systems by Using an Additional Capacitive Element — Edward Michlowicz · Management Systems in Production Engineering (2025) | TGRS Research Map | TGRS