Single-machine two-agent scheduling with a rate-modifying activity and weighted due-date-related functions
Abstract We analyze two-agent scheduling problems with weighted due-date-related scheduling criteria and an optional rate-modifying activity that, when completed, allows jobs to be completed faster. We start with the single-agent problem of minimizing the total weighted late work and then extend the results over to two-agent problems involving combinations of the weighted number of late jobs and the total weighted late work. We examine the properties of optimal schedules and provide efficient pseudo-polynomial time algorithms to solve these problems.
Authors
- Daniel Oron (ORCID: https://orcid.org/0000-0002-2571-6676)
- Johnson Phosavanh (ORCID: https://orcid.org/0000-0002-3073-5230)
Institutions
- The University of Sydney (AU)
Publication Details
- Journal
- Journal of Scheduling
- Published
- 2025-08-04
- DOI
- https://doi.org/10.1007/s10951-025-00853-0
- Citations
- 1
- Primary Topic
- Scheduling and Optimization Algorithms
- Type
- article
- Field-Weighted Citation Impact
- 1.24
Funders
- University of Sydney