Modeling Batch Scheduling in a Three-Stage Flow Shop with Multi-Item on Batch-Job-Batch Processors to Minimize Total Actual Flow Time

This research discusses batch scheduling in a three-stage flow shop with batch-job-batch processors. The performance criterion of this research is to minimize the total actual flow time while considering multiple items that must be completed by a specified due date. This problem is formulated as a mathematical model and solved using a heuristic algorithm. The decision variables include the number of batches, batch size, batch position, and the start time of processing each batch at each stage. The model is tested through scenarios by varying parameters such as the number of batches, batch size, due date, and number of item types to assess the system's capability under different conditions. The test results show that the proposed scheduling model effectively solves the batch scheduling problem in a three-stage flow shop with batch-job-batch processing machines, minimizing the total actual flow time with a common due date. The results also indicate that the proposed model is sensitive to changes in parameters such as the demand for each item type, the capacity of the batch processing machine, and the number of item types, but not to changes in the common due date parameter.

Authors

Publication Details

Journal
Industrial Engineering & Management Systems
Published
2025-06-30
DOI
https://doi.org/10.7232/iems.2025.24.2.188
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Modeling Batch Scheduling in a Three-Stage Flow Shop with Multi-Item on Batch-Job-Batch Processors to Minimize Total Actual Flow Time

Ayu Anggraeni Sibarani, Dandun Mahesa Prabowoputra, Putri Melita
Industrial Engineering & Management Systems
Scheduling and Optimization Algorithms
article

Modeling Batch Scheduling in a Three-Stage Flow Shop with Multi-Item on Batch-Job-Batch Processors to Minimize Total Actual Flow Time

Ayu Anggraeni Sibarani, Dandun Mahesa Prabowoputra, Putri Melita
article en

Abstract

This research discusses batch scheduling in a three-stage flow shop with batch-job-batch processors. The performance criterion of this research is to minimize the total actual flow time while considering multiple items that must be completed by a specified due date. This problem is formulated as a mathematical model and solved using a heuristic algorithm. The decision variables include the number of batches, batch size, batch position, and the start time of processing each batch at each stage. The model is tested through scenarios by varying parameters such as the number of batches, batch size, due date, and number of item types to assess the system's capability under different conditions. The test results show that the proposed scheduling model effectively solves the batch scheduling problem in a three-stage flow shop with batch-job-batch processing machines, minimizing the total actual flow time with a common due date. The results also indicate that the proposed model is sensitive to changes in parameters such as the demand for each item type, the capacity of the batch processing machine, and the number of item types, but not to changes in the common due date parameter.

Industrial Engineering & Management SystemsVol. 24(2)
Decent work and economic growth
Openalex Percentile: Top 73%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.