FACTORS CAUSING THE DECLINE IN CERAMIC WORKERS' PRODUCTIVITY AND STRATEGIES FOR IMPROVEMENT

This study examines the comparison of labor productivity during normal working hours and overtime in the ceramic installation work of the Transit Office renovation project of the Ministry of Finance in Balikpapan City.The main issue is how the value of labor productivity differs between normal working hours and overtime, and its impact on the decline in productivity and the increase in wage costs.The research method was conducted through direct observation in the field over 10 days during normal working hours (08:00–16:00) and overtime hours (19:00–22:00), focusing on the productivity of ceramic workers using 60cmx60cm ceramic tiles.The research results show a significant difference in labor productivity between normal working hours and overtime, where productivity during overtime decreases due to fatigue, which also leads to an increase in labor wage costs.In conclusion, although overtime can accelerate project completion in the short term, the implementation of overtime hours in the long term negatively impacts productivity and cost efficiency. Therefore, proper management of overtime hours is necessary to maintain a balance between time, cost, and quality in construction projects.

Authors

Institutions

Publication Details

Journal
Publikasi Riset Orientasi Teknik Sipil (Proteksi)
Published
2025-06-30
DOI
https://doi.org/10.26740/proteksi.v7n1.p76-85
Primary Topic
Recycling and utilization of industrial and municipal waste in materials production
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

FACTORS CAUSING THE DECLINE IN CERAMIC WORKERS' PRODUCTIVITY AND STRATEGIES FOR IMPROVEMENT

Candra Irawan, Mahfud Mahfud, Ferdy Kahandanie, Ferdy Novri
Publikasi Riset Orientasi Teknik Sipil (Proteksi)
Recycling and utilization of industrial and municipal waste in materials production
article

FACTORS CAUSING THE DECLINE IN CERAMIC WORKERS' PRODUCTIVITY AND STRATEGIES FOR IMPROVEMENT

Candra Irawan, Mahfud Mahfud, Ferdy Kahandanie, Ferdy Novri
article en

Abstract

This study examines the comparison of labor productivity during normal working hours and overtime in the ceramic installation work of the Transit Office renovation project of the Ministry of Finance in Balikpapan City.The main issue is how the value of labor productivity differs between normal working hours and overtime, and its impact on the decline in productivity and the increase in wage costs.The research method was conducted through direct observation in the field over 10 days during normal working hours (08:00–16:00) and overtime hours (19:00–22:00), focusing on the productivity of ceramic workers using 60cmx60cm ceramic tiles.The research results show a significant difference in labor productivity between normal working hours and overtime, where productivity during overtime decreases due to fatigue, which also leads to an increase in labor wage costs.In conclusion, although overtime can accelerate project completion in the short term, the implementation of overtime hours in the long term negatively impacts productivity and cost efficiency. Therefore, proper management of overtime hours is necessary to maintain a balance between time, cost, and quality in construction projects.

Publikasi Riset Orientasi Teknik Sipil (Proteksi)Vol. 7(1)
Universitas Balikpapan (ID)
Openalex Percentile: Top 79%
Recycling and utilization of industrial and municipal waste in materials production
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.