Multi‐Objective Comprehensive Approach for Flexible Assembly Job Shop Scheduling Problem with <scp>AGVs</scp>

This paper addresses the comprehensive scheduling problem in a flexible assembly job shop with AGV handling (FAJSP‐AGVs), where machining processes and assembly activities between different processes are conducted. A mathematical model is established with objectives to minimize makespan, total machine energy consumption, and AGV working time. An improved adaptive NSGA‐II algorithm (IA‐NSGA‐II) is proposed, incorporating a process constraint matrix‐based encoding method, adaptive crossover and mutation operators, and a variable neighborhood search (VNS) to avoid local optima. Simulation experiments validate the effectiveness of the proposed algorithm, showing superior performance compared to existing methods such as INSGA‐II and IGA. An ablation study further demonstrates the contributions of the adaptive probability mechanism and VNS, highlighting their roles in enhancing solution quality and avoiding local optima. The proposed method is also tested in dynamic rescheduling scenarios, demonstrating its stability and adaptability in handling machine breakdowns. Experimental results indicate that IA‐NSGA‐II achieves better scheduling outcomes with shorter makespan, lower energy consumption, and reduced AGV working time. © 2025 Institute of Electrical Engineers of Japan and Wiley Periodicals LLC.

Authors

Institutions

Publication Details

Journal
IEEJ Transactions on Electrical and Electronic Engineering
Published
2025-07-25
DOI
https://doi.org/10.1002/tee.70114
Citations
2
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
2.48
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Multi‐Objective Comprehensive Approach for Flexible Assembly Job Shop Scheduling Problem with AGVs

Huan Yang, Shigeru Fujimura
2 citations
IEEJ Transactions on Electrical and Electronic Engineering
Scheduling and Optimization Algorithms
2.48
article

Multi‐Objective Comprehensive Approach for Flexible Assembly Job Shop Scheduling Problem with AGVs

Huan Yang, Shigeru Fujimura
article en
2 citations

Abstract

This paper addresses the comprehensive scheduling problem in a flexible assembly job shop with AGV handling (FAJSP‐AGVs), where machining processes and assembly activities between different processes are conducted. A mathematical model is established with objectives to minimize makespan, total machine energy consumption, and AGV working time. An improved adaptive NSGA‐II algorithm (IA‐NSGA‐II) is proposed, incorporating a process constraint matrix‐based encoding method, adaptive crossover and mutation operators, and a variable neighborhood search (VNS) to avoid local optima. Simulation experiments validate the effectiveness of the proposed algorithm, showing superior performance compared to existing methods such as INSGA‐II and IGA. An ablation study further demonstrates the contributions of the adaptive probability mechanism and VNS, highlighting their roles in enhancing solution quality and avoiding local optima. The proposed method is also tested in dynamic rescheduling scenarios, demonstrating its stability and adaptability in handling machine breakdowns. Experimental results indicate that IA‐NSGA‐II achieves better scheduling outcomes with shorter makespan, lower energy consumption, and reduced AGV working time. © 2025 Institute of Electrical Engineers of Japan and Wiley Periodicals LLC.

IEEJ Transactions on Electrical and Electronic EngineeringVol. 21(2)
Waseda University (JP), The University of Kitakyushu (JP)
Openalex Percentile: Top 10%
Scheduling and Optimization Algorithms
2.48
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.