Perencanaan Pemeliharaan 32.000 Jam di PLTMGU Lombok untuk Optimalisasi Equivalent Availability Factor

PT. Wartsila Indonesia, as the manager of the Lombok Gas and Steam Engine Power Plant (PLTMGU) has an obligation to maintain an Equivalent Availability Factor (EAF) above 90%. In 2024, EAF will be recorded at 96.97%, with a total outage of 3,726 hours due to Planned Outage (PO) and Force Outage (FO). For 2025, EAF is predicted to be 90.02% with a PO of 7,958 Hours. The planned duration of the PO for 32,000 hours of maintenance is 18 days or 432 hours. The total number of machines that will carry out maintenance of these 32,000 hours is nine Wartsila machines W20V34DF. This study aims to plan a 32,000-hour maintenance activity schedule using the Work Breakdown Structure (WBS) method, and the Critical Path Method (CPM). The study successfully shortened the planned maintenance duration from 18 days (432 hours) to 15 days (345 hours), saving 87 hours per machine. This reduction in maintenance duration can increase EAF and anticipate FO by providing a UOH allocation of 274 hours. With this allocation, the EAF Prediction in 2025 increased to 90.66% beyond the initial prediction. These results confirm the importance of careful planning and management of maintenance schedules to maintain operational sustainability and improve power plant performance.

Authors

Institutions

Publication Details

Journal
Jurnal Pendidikan Indonesia
Published
2025-07-25
DOI
https://doi.org/10.59141/japendi.v6i7.8464
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Perencanaan Pemeliharaan 32.000 Jam di PLTMGU Lombok untuk Optimalisasi Equivalent Availability Factor

Kusnendar Trianto Rudianto, Oviyan Patra
1 links
Jurnal Pendidikan Indonesia
Management and Optimization Techniques
article

Perencanaan Pemeliharaan 32.000 Jam di PLTMGU Lombok untuk Optimalisasi Equivalent Availability Factor

Kusnendar Trianto Rudianto, Oviyan Patra
article en

Abstract

PT. Wartsila Indonesia, as the manager of the Lombok Gas and Steam Engine Power Plant (PLTMGU) has an obligation to maintain an Equivalent Availability Factor (EAF) above 90%. In 2024, EAF will be recorded at 96.97%, with a total outage of 3,726 hours due to Planned Outage (PO) and Force Outage (FO). For 2025, EAF is predicted to be 90.02% with a PO of 7,958 Hours. The planned duration of the PO for 32,000 hours of maintenance is 18 days or 432 hours. The total number of machines that will carry out maintenance of these 32,000 hours is nine Wartsila machines W20V34DF. This study aims to plan a 32,000-hour maintenance activity schedule using the Work Breakdown Structure (WBS) method, and the Critical Path Method (CPM). The study successfully shortened the planned maintenance duration from 18 days (432 hours) to 15 days (345 hours), saving 87 hours per machine. This reduction in maintenance duration can increase EAF and anticipate FO by providing a UOH allocation of 274 hours. With this allocation, the EAF Prediction in 2025 increased to 90.66% beyond the initial prediction. These results confirm the importance of careful planning and management of maintenance schedules to maintain operational sustainability and improve power plant performance.

Jurnal Pendidikan IndonesiaVol. 6(7)
Universitas Jenderal Achmad Yani (ID)
Openalex Percentile: Top 71%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.