Research on visual monitoring of prefabricated component assembly process based on workflow and BIM

With the vigorous development of prefabricated construction, data management and dynamic monitoring in the assembly process of prefabricated components have become key challenges. This research thoroughly integrates workflow and BIM technologies, innovatively constructing a comprehensive visual monitoring system. By reshaping the business process, establishing a refined data management model, and designing an efficient visual monitoring system, precise control and management of the assembly process of prefabricated components have been achieved. This system has achieved remarkable results in practical engineering applications. Future research will focus on the in-depth integration of Internet of Things technology and intelligent decision-making optimization, promoting the management of prefabricated construction to a higher level of intelligence.

Authors

Publication Details

Journal
Advances in Engineering Technology Research
Published
2025-05-29
DOI
https://doi.org/10.56028/aetr.14.1.8.2025
Primary Topic
Manufacturing Process and Optimization
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on visual monitoring of prefabricated component assembly process based on workflow and BIM

Qing Tian, Shaoxiong Ma, Z.G. Ni, Cheng Wang et al.
Advances in Engineering Technology Research
Manufacturing Process and Optimization
article

Research on visual monitoring of prefabricated component assembly process based on workflow and BIM

Qing Tian, Shaoxiong Ma, Z.G. Ni, Cheng Wang, Hailiang Zhang, G Yang
article en

Abstract

With the vigorous development of prefabricated construction, data management and dynamic monitoring in the assembly process of prefabricated components have become key challenges. This research thoroughly integrates workflow and BIM technologies, innovatively constructing a comprehensive visual monitoring system. By reshaping the business process, establishing a refined data management model, and designing an efficient visual monitoring system, precise control and management of the assembly process of prefabricated components have been achieved. This system has achieved remarkable results in practical engineering applications. Future research will focus on the in-depth integration of Internet of Things technology and intelligent decision-making optimization, promoting the management of prefabricated construction to a higher level of intelligence.

Advances in Engineering Technology ResearchVol. 14(1)
Education Department of Shaanxi Province
Openalex Percentile: Top 73%
Manufacturing Process and Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Research on visual monitoring of prefabricated component assembly process based on workflow and BIM — Qing Tian, Shaoxiong Ma, et al. · Advances in Engineering Technology Research (2025) | TGRS Research Map | TGRS