Integrating meta-heuristics and Q-learning for solving hybrid flow shop scheduling and rescheduling problems with reentrant

The rapid development of the manufacturing industry lead to complex production scheduling processes, in which reentrant operation is an aspect that needs special consideration. Reentrant is rarely considered in the literature, even if it has widespread applications in manufacturing industry. This study investigates the reentrant hybrid flow shop scheduling and rescheduling problems (RHFSRSP) minimize the maximum completion time (makespan). First, a mathematical model is established for the RHFSRSP. Considering the reentrant operation, a left-shift strategy is proposed to optimize the makespan in solution decoding section further. Second, the following four meta-heuristics: genetic algorithm (GA), particle swarm optimization (PSO), differential evolution (DE), and artificial bee colony (ABC) are proposed to solve the concerned problems. Furthermore, five local search operations are developed and integrated into the four meta-heuristics to enhance their performance. Third, for selecting high-quality local search operations efficiently, a Q-learning-based local search selection strategy is adopted to replace the random selection strategy. Finally, the relative percentage deviation metric is employed to verify the effectiveness of the proposed enhancement strategies based on a set of benchmark instances. For further performance assessment, the Friedman test is performed on the results of all compared algorithms. The empirical outcomes demonstrate that the ABC algorithm with Q-learning exhibits the strongest competitiveness for solving the RHFSRSP.

Authors

Institutions

Publication Details

Journal
Journal of Industrial and Management Optimization
Published
2025-01-01
DOI
https://doi.org/10.3934/jimo.2025121
Citations
2
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
2.48

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Integrating meta-heuristics and Q-learning for solving hybrid flow shop scheduling and rescheduling problems with reentrant

FU Ya-ping, Humyun Fuad Rahman, Kaizhou Gao, Peng Qi et al.
2 citations
Journal of Industrial and Management Optimization
Scheduling and Optimization Algorithms
2.48
article

Integrating meta-heuristics and Q-learning for solving hybrid flow shop scheduling and rescheduling problems with reentrant

FU Ya-ping, Humyun Fuad Rahman, Kaizhou Gao, Peng Qi, Junqing Li
article en
2 citations

Abstract

The rapid development of the manufacturing industry lead to complex production scheduling processes, in which reentrant operation is an aspect that needs special consideration. Reentrant is rarely considered in the literature, even if it has widespread applications in manufacturing industry. This study investigates the reentrant hybrid flow shop scheduling and rescheduling problems (RHFSRSP) minimize the maximum completion time (makespan). First, a mathematical model is established for the RHFSRSP. Considering the reentrant operation, a left-shift strategy is proposed to optimize the makespan in solution decoding section further. Second, the following four meta-heuristics: genetic algorithm (GA), particle swarm optimization (PSO), differential evolution (DE), and artificial bee colony (ABC) are proposed to solve the concerned problems. Furthermore, five local search operations are developed and integrated into the four meta-heuristics to enhance their performance. Third, for selecting high-quality local search operations efficiently, a Q-learning-based local search selection strategy is adopted to replace the random selection strategy. Finally, the relative percentage deviation metric is employed to verify the effectiveness of the proposed enhancement strategies based on a set of benchmark instances. For further performance assessment, the Friedman test is performed on the results of all compared algorithms. The empirical outcomes demonstrate that the ABC algorithm with Q-learning exhibits the strongest competitiveness for solving the RHFSRSP.

Journal of Industrial and Management OptimizationVol. 21(10)
Qingdao University (CN), Yunnan Normal University (CN), Liaocheng University (CN), Newcastle University (GB)
National Natural Science Foundation of China, Fundo para o Desenvolvimento das Ciências e da Tecnologia, Basic and Applied Basic Research Foundation of Guangdong Province
Openalex Percentile: Top 10%
Scheduling and Optimization Algorithms
2.48
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.