Fire Safety Design of a Five Storey Office Building: Fire Design and Smoke Control

Over 75 % of fatalities recorded from fire incidents are attributed to the effects of smoke rather than the direct burning from the fire. A fire safety design and smoke control were conducted in Asha Office Building. A restaurant is considered to be the worst-case scenario. Hence, appropriate fire protection measures such as smoke detectors, heat detectors and sprinklers are to be installed. Using a fire load density of 570 MJ/m2 for an office building, an ignition will take place at 388 seconds. The heat release required at the growth stage of the fire is 1,460 kW and the time required for the smoke detector to respond is 353 seconds. A heat release rate of 10.7 MW at a temperature of 596oC at 956 seconds would be reached before a flashover occurs. At a fully developed fire stage, the heat release rate is almost twice (20 MW) that of flashover stage which is 10.7 MW. The type of smoke control system to be adopted in Asha office building is smoke and heat exhaust ventilation system (SHEVS). For an effective operation of SHEVS at any time, both natural and mechanical ventilators should be installed but not to operate simultaneously in the same smoke reservoir. With a convective heat flux of 5,993 kW, the mass flow rate of smoke in the restaurant is 32 kg/s. A minimum number of three exhaust points will be required based on a volumetric flow rate of 43 m3/s.

Authors

Publication Details

Journal
BIMA JOURNAL OF SCIENCE AND TECHNOLOGY GOMBE
Published
2024-10-30
DOI
https://doi.org/10.64290/bima.v8i3b.779
Primary Topic
Fire dynamics and safety research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Fire Safety Design of a Five Storey Office Building: Fire Design and Smoke Control

A. S. Bature, Mohammed Shariff Lawal, Abdulmajid M. Na’inna
BIMA JOURNAL OF SCIENCE AND TECHNOLOGY GOMBE
Fire dynamics and safety research
article

Fire Safety Design of a Five Storey Office Building: Fire Design and Smoke Control

A. S. Bature, Mohammed Shariff Lawal, Abdulmajid M. Na’inna
article en

Abstract

Over 75 % of fatalities recorded from fire incidents are attributed to the effects of smoke rather than the direct burning from the fire. A fire safety design and smoke control were conducted in Asha Office Building. A restaurant is considered to be the worst-case scenario. Hence, appropriate fire protection measures such as smoke detectors, heat detectors and sprinklers are to be installed. Using a fire load density of 570 MJ/m2 for an office building, an ignition will take place at 388 seconds. The heat release required at the growth stage of the fire is 1,460 kW and the time required for the smoke detector to respond is 353 seconds. A heat release rate of 10.7 MW at a temperature of 596oC at 956 seconds would be reached before a flashover occurs. At a fully developed fire stage, the heat release rate is almost twice (20 MW) that of flashover stage which is 10.7 MW. The type of smoke control system to be adopted in Asha office building is smoke and heat exhaust ventilation system (SHEVS). For an effective operation of SHEVS at any time, both natural and mechanical ventilators should be installed but not to operate simultaneously in the same smoke reservoir. With a convective heat flux of 5,993 kW, the mass flow rate of smoke in the restaurant is 32 kg/s. A minimum number of three exhaust points will be required based on a volumetric flow rate of 43 m3/s.

BIMA JOURNAL OF SCIENCE AND TECHNOLOGY GOMBEVol. 8(3B)
Openalex Percentile: Top 63%
Fire dynamics and safety research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Fire Safety Design of a Five Storey Office Building: Fire Design and Smoke Control — A. S. Bature, Mohammed Shariff Lawal, et al. · BIMA JOURNAL OF SCIENCE AND TECHNOLOGY GOMBE (2024) | TGRS Research Map | TGRS