Schedule Optimization for Dry Dock Construction Projects in Spatially Constrained Naval Facilities

Construction of dry docks in spatially restricted naval plants is deemed unique project endeavours that are characterized by the need to consider scheduled timing to prevent loss of time, hindered work dislocation, and safety concerns in the limited workspace and relying on extensive interdependency in the activities. In this study, the focus is on developing optimization approaches to dry dock construction schedules where phased segmentation of the space solutions is interrelated, floating and semi-submersible platforms are used temporarily to increase working space and crane logistics are planned considering the limited space of the naval corridors. The use of 4D Building Information Modeling (BIM) and location-based scheduling methods in relation to its visualization in real-time and enhanced stakeholder coordination is also included in the study. There is also the discussion of the strategies to reduce schedule risks due to tidal windows and the environmental regulations, which overlooks its compliance, but compliance does not affect the project timelines. Validation in the form of a case based on the comparison of the metrics such as project duration, the idle time of the cranes, and schedule reliability shows that the suggested methods may cut the construction time by up to 16.7 per cent and enhance the schedule compliance by around 15 per cent. The outcomes demonstrate that the integration of both advanced planning practices and digital technologies boasts the efficiency of improving the schedule performance of dry dock constructions in naval and defence-related port structures. The results also provide immediate advice to managers of naval facilities, contractors, and construction planners who need to maximize scheduling performance under extreme spatial limitations, thus enhancing the overall effectiveness and minimizing the disturbance of the activity in sensitive maritime premises.

Authors

Publication Details

Journal
IOSR Journal of Mechanical and Civil Engineering
Published
2025-01-01
DOI
https://doi.org/10.9790/1684-2201017585
Primary Topic
Optimization and Packing Problems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Schedule Optimization for Dry Dock Construction Projects in Spatially Constrained Naval Facilities

P. Panchal
IOSR Journal of Mechanical and Civil Engineering
Optimization and Packing Problems
article

Schedule Optimization for Dry Dock Construction Projects in Spatially Constrained Naval Facilities

P. Panchal
article en

Abstract

Construction of dry docks in spatially restricted naval plants is deemed unique project endeavours that are characterized by the need to consider scheduled timing to prevent loss of time, hindered work dislocation, and safety concerns in the limited workspace and relying on extensive interdependency in the activities. In this study, the focus is on developing optimization approaches to dry dock construction schedules where phased segmentation of the space solutions is interrelated, floating and semi-submersible platforms are used temporarily to increase working space and crane logistics are planned considering the limited space of the naval corridors. The use of 4D Building Information Modeling (BIM) and location-based scheduling methods in relation to its visualization in real-time and enhanced stakeholder coordination is also included in the study. There is also the discussion of the strategies to reduce schedule risks due to tidal windows and the environmental regulations, which overlooks its compliance, but compliance does not affect the project timelines. Validation in the form of a case based on the comparison of the metrics such as project duration, the idle time of the cranes, and schedule reliability shows that the suggested methods may cut the construction time by up to 16.7 per cent and enhance the schedule compliance by around 15 per cent. The outcomes demonstrate that the integration of both advanced planning practices and digital technologies boasts the efficiency of improving the schedule performance of dry dock constructions in naval and defence-related port structures. The results also provide immediate advice to managers of naval facilities, contractors, and construction planners who need to maximize scheduling performance under extreme spatial limitations, thus enhancing the overall effectiveness and minimizing the disturbance of the activity in sensitive maritime premises.

IOSR Journal of Mechanical and Civil EngineeringVol. 22(1)
Openalex Percentile: Top 74%
Optimization and Packing Problems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Schedule Optimization for Dry Dock Construction Projects in Spatially Constrained Naval Facilities — P. Panchal · IOSR Journal of Mechanical and Civil Engineering (2025) | TGRS Research Map | TGRS