Comparative Analysis of Contract Prices with Basic Prices for Structural and Architectural Works (Case Study: Construction of The Jayapura III-19 Military Court Office Building)

This research aims to analyze the comparison between contract prices and basic prices for structural and architectural works in the construction project of the Military Court Office Building III-19 Jayapura. This comparison is essential to ensure budget efficiency and to prevent budget misuse through unreasonable mark-up practices. The research employs a quantitative approach and the cost-plus pricing method, with data obtained from field surveys (primary data) and project documentation (secondary data). The results indicate a price difference of 2.4% for structural work and 10.4% for architectural work between contract prices and basic prices. According to the fair profit analysis based on the Ministry of Public Works Regulation No. 1 of 2022, most of the works fall within the acceptable profit margin of 10–15%. This study is expected to serve as a reference for future planning and control of construction project budgets.

Authors

Publication Details

Journal
West Science Interdisciplinary Studies
Published
2025-06-30
DOI
https://doi.org/10.58812/wsis.v3i06.2108
Primary Topic
Value Engineering and Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Comparative Analysis of Contract Prices with Basic Prices for Structural and Architectural Works (Case Study: Construction of The Jayapura III-19 Military Court Office Building)

Erwin Erwin, Antas Haulian Sinaga, Adrian Carlos
1 links
West Science Interdisciplinary Studies
Value Engineering and Management
article

Comparative Analysis of Contract Prices with Basic Prices for Structural and Architectural Works (Case Study: Construction of The Jayapura III-19 Military Court Office Building)

Erwin Erwin, Antas Haulian Sinaga, Adrian Carlos
article en

Abstract

This research aims to analyze the comparison between contract prices and basic prices for structural and architectural works in the construction project of the Military Court Office Building III-19 Jayapura. This comparison is essential to ensure budget efficiency and to prevent budget misuse through unreasonable mark-up practices. The research employs a quantitative approach and the cost-plus pricing method, with data obtained from field surveys (primary data) and project documentation (secondary data). The results indicate a price difference of 2.4% for structural work and 10.4% for architectural work between contract prices and basic prices. According to the fair profit analysis based on the Ministry of Public Works Regulation No. 1 of 2022, most of the works fall within the acceptable profit margin of 10–15%. This study is expected to serve as a reference for future planning and control of construction project budgets.

West Science Interdisciplinary StudiesVol. 3(06)
Openalex Percentile: Top 72%
Value Engineering and Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.