Study on the peak shaving operation of cascade hydropower stations based on the plant-wide optimal curve

• Developed a plant-wide optimal curve to address unit commitment in wind–PV–hydropower peak shaving. • Improved DDDPSA algorithm significantly reduced computation time and enhanced convergence stability. • Analyzed upstream reservoirs’ peak shaving under varying water use, confirming real-time dispatch practicality. • Case study on the Hongshui River validated the model’s effectiveness in real dispatch scenarios. A large number of renewable energy sources (RESs), such as wind and photovoltaics (PV), have increased the importance of hydropower stations with regulating capacity in peak shaving operation. However, optimizing load distribution among cascade hydropower units remains challenging. This study proposes a novel method to enhance RES and hydropower utilization through: 1) Establishing a plant-wide optimal output-water level-outflow relationship curve based on the output-head-flow relationship and the flow-head loss and outflow-tailwater level relationship curves for each unit; 2) Developing a short-term peak shaving model for cascaded hydropower stations that incorporates wind and PV power which defines minimum coefficient of variation of residual load as objective functions, and improving discrete differential dynamic programming successive approximation (DDDPSA) method to solve it; 3) Analyzing the peak shaving capacity of the cascade hydropower station by varying water consumption for power generation. A case study on the Hongshui River demonstrates the practicality and effectiveness of the proposed method. The computation time is reduced by over 98% in typical scenarios, and the proposed algorithm maintains convergence even when the traditional method fails. The model provides technical support for the integrated scheduling of hydropower, wind, and PV systems.

Authors

Institutions

Publication Details

Journal
International Journal of Electrical Power & Energy Systems
Published
2025-07-30
DOI
https://doi.org/10.1016/j.ijepes.2025.110920
Primary Topic
Water resources management and optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Study on the peak shaving operation of cascade hydropower stations based on the plant-wide optimal curve

Xueshan Ai, Kui Huang, Lulu Zhao, Yongjiang Yu et al.
International Journal of Electrical Power & Energy Systems
Water resources management and optimization
article

Study on the peak shaving operation of cascade hydropower stations based on the plant-wide optimal curve

Xueshan Ai, Kui Huang, Lulu Zhao, Yongjiang Yu, Xuanyu Shi, Xiang Fu, Fengshuo Liu
article en

Abstract

• Developed a plant-wide optimal curve to address unit commitment in wind–PV–hydropower peak shaving. • Improved DDDPSA algorithm significantly reduced computation time and enhanced convergence stability. • Analyzed upstream reservoirs’ peak shaving under varying water use, confirming real-time dispatch practicality. • Case study on the Hongshui River validated the model’s effectiveness in real dispatch scenarios. A large number of renewable energy sources (RESs), such as wind and photovoltaics (PV), have increased the importance of hydropower stations with regulating capacity in peak shaving operation. However, optimizing load distribution among cascade hydropower units remains challenging. This study proposes a novel method to enhance RES and hydropower utilization through: 1) Establishing a plant-wide optimal output-water level-outflow relationship curve based on the output-head-flow relationship and the flow-head loss and outflow-tailwater level relationship curves for each unit; 2) Developing a short-term peak shaving model for cascaded hydropower stations that incorporates wind and PV power which defines minimum coefficient of variation of residual load as objective functions, and improving discrete differential dynamic programming successive approximation (DDDPSA) method to solve it; 3) Analyzing the peak shaving capacity of the cascade hydropower station by varying water consumption for power generation. A case study on the Hongshui River demonstrates the practicality and effectiveness of the proposed method. The computation time is reduced by over 98% in typical scenarios, and the proposed algorithm maintains convergence even when the traditional method fails. The model provides technical support for the integrated scheduling of hydropower, wind, and PV systems.

International Journal of Electrical Power & Energy SystemsVol. 170
Wuhan University (CN), China Southern Power Grid (China) (CN), Power Grid Corporation (India) (IN)
Openalex Percentile: Top 78%
Water resources management and optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.