Kajian Teknis Alat Muat dan Alat Angkut Untuk Memenuhi Target Produksi Pada Penambangan di PT Hillconjaya Sakti Jobsite PT Weda Bay Nickel, Lelilef, Halmahera Tengah, Maluku Utara

PT. Hillconjaya Sakti is a company that focuses on the nickel ore mining industry sector. This company is located in Lelilef Village, Weda Tengah District, Central Halmahera Regency, North Maluku Province. PT. Hillconjaya Sakti has a production target of 115,000 tons/month for one working fleet to transport nickel ore from the mining front to the stockpile/TOS. In nickel ore mining activities, mechanical equipment is needed such as loading equipment and transportation equipment. Production produced by loading equipment was 105.834,33 tons/month or 92,03% of the production target, while articulated dump trucks reached 94.237,80 tons/month or 81,95% of the production target. From these production results it can be seen It was concluded that production achievement had not met the target, so it was necessary to study the performance of loading and conveying equipment in nickel ore mining activities so that the company's desired targets could be achieved. The results of the research obtained suggestions for problems to increase production in February 2024 by increasing effective working time. Improving effective working time is carried out by suppressing obstacles that occur and cleaning up residual material on the side of the road to widen the road so that there is a reduction in the circulation time of mechanical equipment. The productivity value of loading equipment after repairs has increased from 105,834.33 tons/month to 134.281,08 tons/month and transportation equipment from 94,237.80 tons/month to 134.087,19 tons/month so that it has met theproduction target set by the company, which is equal to 115,000 tons/month in February.

Authors

Institutions

Publication Details

Journal
Jurnal Teknologi Pertambangan
Published
2025-02-07
DOI
https://doi.org/10.31315/jtp.v10i2.14551
Primary Topic
Mining Techniques and Economics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Kajian Teknis Alat Muat dan Alat Angkut Untuk Memenuhi Target Produksi Pada Penambangan di PT Hillconjaya Sakti Jobsite PT Weda Bay Nickel, Lelilef, Halmahera Tengah, Maluku Utara

Kristanto Jiwo Saputro, Gunawan Nusanto, Inmarlinianto Inmarlinianto, Lewi Agri Syebat Damanik et al.
Jurnal Teknologi Pertambangan
Mining Techniques and Economics
article

Kajian Teknis Alat Muat dan Alat Angkut Untuk Memenuhi Target Produksi Pada Penambangan di PT Hillconjaya Sakti Jobsite PT Weda Bay Nickel, Lelilef, Halmahera Tengah, Maluku Utara

Kristanto Jiwo Saputro, Gunawan Nusanto, Inmarlinianto Inmarlinianto, Lewi Agri Syebat Damanik, Dwi Poetranto Waluyo Adji
article en

Abstract

PT. Hillconjaya Sakti is a company that focuses on the nickel ore mining industry sector. This company is located in Lelilef Village, Weda Tengah District, Central Halmahera Regency, North Maluku Province. PT. Hillconjaya Sakti has a production target of 115,000 tons/month for one working fleet to transport nickel ore from the mining front to the stockpile/TOS. In nickel ore mining activities, mechanical equipment is needed such as loading equipment and transportation equipment. Production produced by loading equipment was 105.834,33 tons/month or 92,03% of the production target, while articulated dump trucks reached 94.237,80 tons/month or 81,95% of the production target. From these production results it can be seen It was concluded that production achievement had not met the target, so it was necessary to study the performance of loading and conveying equipment in nickel ore mining activities so that the company's desired targets could be achieved. The results of the research obtained suggestions for problems to increase production in February 2024 by increasing effective working time. Improving effective working time is carried out by suppressing obstacles that occur and cleaning up residual material on the side of the road to widen the road so that there is a reduction in the circulation time of mechanical equipment. The productivity value of loading equipment after repairs has increased from 105,834.33 tons/month to 134.281,08 tons/month and transportation equipment from 94,237.80 tons/month to 134.087,19 tons/month so that it has met theproduction target set by the company, which is equal to 115,000 tons/month in February.

Jurnal Teknologi PertambanganVol. 10(2)
Universitas Pembangunan Nasional Veteran Yogyakarta (ID)
Openalex Percentile: Top 78%
Mining Techniques and Economics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.