Research on Improvement of Electric Smoothie Machine Production Management Based on Industrial Engineering Methods

This paper focuses on the low production line balance rate and prominent bottleneck processes in smoothie machine production line. It employs industrial engineering methodologies to conduct optimization research. The stopwatch time research method is used to determine the operation time of each workstation, and the standard time of the process is determined by standardization analysis, then the operation status of the production line is diagnosed and evaluated, and the 5W1H question technology and ECRS principle are used to optimize the process. In view of the bottleneck process, the two-hand operation was analyzed, and the operator’s two-hand action was improved according to the principle of action economy. The results show that the balance rate, balance rate, loss rate, production takt time and daily capacity of the improved production line have been greatly improved. This study provides effective methodologies and practical case references for household appliance manufacturing.

Authors

Publication Details

Journal
Engineering
Published
2025-01-01
DOI
https://doi.org/10.4236/eng.2025.177021
Primary Topic
Assembly Line Balancing Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on Improvement of Electric Smoothie Machine Production Management Based on Industrial Engineering Methods

Qian Tang, Ren Yu, Jiande Wang, Heping Li
Engineering
Assembly Line Balancing Optimization
article

Research on Improvement of Electric Smoothie Machine Production Management Based on Industrial Engineering Methods

Qian Tang, Ren Yu, Jiande Wang, Heping Li
article en

Abstract

This paper focuses on the low production line balance rate and prominent bottleneck processes in smoothie machine production line. It employs industrial engineering methodologies to conduct optimization research. The stopwatch time research method is used to determine the operation time of each workstation, and the standard time of the process is determined by standardization analysis, then the operation status of the production line is diagnosed and evaluated, and the 5W1H question technology and ECRS principle are used to optimize the process. In view of the bottleneck process, the two-hand operation was analyzed, and the operator’s two-hand action was improved according to the principle of action economy. The results show that the balance rate, balance rate, loss rate, production takt time and daily capacity of the improved production line have been greatly improved. This study provides effective methodologies and practical case references for household appliance manufacturing.

EngineeringVol. 17(07)
Industry, innovation and infrastructure
Openalex Percentile: Top 74%
Assembly Line Balancing Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.