Design of Real-Time Project Monitoring Dashboard Using Kimball’s Data Warehouse Approach and Google Data Studio

The growth of the construction industry in Indonesia triggers an increasing need for an efficient project management system, especially in presenting project data accurately and in real-time. PT Dream Island Development (PT DID), a specialist MEP contractor company, faces challenges in presenting project reports to executives because the data is still presented in the form of Excel tabulations which require up to three days of processing time and are difficult to interpret quickly. This research aims to design an interactive dashboard-based project data visualization system using Google Data Studio (Looker Studio) to present project information intuitively and responsively. The method used includes a software engineering approach with five main stages: requirements analysis, data warehouse design, ETL process using Pentaho Data Integration, visualization using Google Data Studio, and testing using User Acceptance Test (UAT). Project data from 2022-2024 was modeled using a star schema and displayed in four main dashboards: project cost, project value, project progress, and details per project. The test results showed a high level of user satisfaction with a functionality score of 93.5%, reliability 91.33%, usability 96%, and efficiency 94.66%. These findings indicate that the developed system effectively supports PT DID's needs in project monitoring and data-based decision-making. The system also has the potential to be replicated in other construction companies as an efficient and scalable business intelligence solution. This research contributes to the growing body of construction informatics by integrating Kimball’s nine-step methodology with modern data visualization tools to enhance project transparency and decision-making.

Authors

Institutions

Publication Details

Journal
SinkrOn
Published
2025-07-12
DOI
https://doi.org/10.33395/sinkron.v9i3.14801
Primary Topic
Customer churn and segmentation
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Design of Real-Time Project Monitoring Dashboard Using Kimball’s Data Warehouse Approach and Google Data Studio

Desak Made Dwi Utami Putra, I Gede Iwan Sudipa, I Made Subrata Sandhiyasa, Yuri Prima Fittryani et al.
SinkrOn
Customer churn and segmentation
article

Design of Real-Time Project Monitoring Dashboard Using Kimball’s Data Warehouse Approach and Google Data Studio

Desak Made Dwi Utami Putra, I Gede Iwan Sudipa, I Made Subrata Sandhiyasa, Yuri Prima Fittryani, Ni Kadek Wiliya Savitri
article en

Abstract

The growth of the construction industry in Indonesia triggers an increasing need for an efficient project management system, especially in presenting project data accurately and in real-time. PT Dream Island Development (PT DID), a specialist MEP contractor company, faces challenges in presenting project reports to executives because the data is still presented in the form of Excel tabulations which require up to three days of processing time and are difficult to interpret quickly. This research aims to design an interactive dashboard-based project data visualization system using Google Data Studio (Looker Studio) to present project information intuitively and responsively. The method used includes a software engineering approach with five main stages: requirements analysis, data warehouse design, ETL process using Pentaho Data Integration, visualization using Google Data Studio, and testing using User Acceptance Test (UAT). Project data from 2022-2024 was modeled using a star schema and displayed in four main dashboards: project cost, project value, project progress, and details per project. The test results showed a high level of user satisfaction with a functionality score of 93.5%, reliability 91.33%, usability 96%, and efficiency 94.66%. These findings indicate that the developed system effectively supports PT DID's needs in project monitoring and data-based decision-making. The system also has the potential to be replicated in other construction companies as an efficient and scalable business intelligence solution. This research contributes to the growing body of construction informatics by integrating Kimball’s nine-step methodology with modern data visualization tools to enhance project transparency and decision-making.

SinkrOnVol. 9(3)
Universitas Informatika dan Bisnis Indonesia (ID), Institut Teknologi dan Bisnis Kalbe (ID), Universitas Teknologi Indonesia (ID)
Openalex Percentile: Top 76%
Customer churn and segmentation
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.