Formalising the formation of project teams considering alternative competence assessments under uncertainty

The subject of this paper is mathematical models and methods of project team formation under conditions of uncertainty regarding candidates’ competences and requirements. The aim is to create an approach to formalising project team formation that considers multiple fuzzy assessments of specific candidate qualities. Tasks to be solved: to define a way of describing a set of fuzzy evaluations of specific qualities of candidates, to define a way of checking whether the candidate's qualities meet the fuzzy requirements, to propose a mathematical model of the problem, and to solve a test case. The methods used are: fuzzy set theory, multicriteria optimisation methods. The following results were obtained: it was proposed to use a trapezoidal fuzzy interval to describe the set of evaluations of specific candidate properties; to determine the compliance of candidate properties with fuzzy requirements, it was proposed to calculate the value of the requirements membership function at the point equal to the lower modal value of the fuzzy interval describing candidate properties; an example of applying the approach to solving the problem of forming a project team is considered. Conclusions. Because of the research conducted, it was proposed to describe multiple evaluations of a particular candidate property using trapezoidal fuzzy intervals. The novelty of the proposed approach lies in the method for evaluating the conformity of a set of assessments of a candidate’s qualities with fuzzy requirements. It is proposed to form a project team by maximising the sum of dominant competencies and the weighted sum of competencies, subject to constraints on the workload of the work, on the fulfilment of competency requirements and on the cost of the team’s work. The generalised function method was applied to solve the multi-criteria problem.

Authors

Publication Details

Journal
RADIOELECTRONIC AND COMPUTER SYSTEMS
Published
2025-05-23
DOI
https://doi.org/10.32620/reks.2025.2.16
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Formalising the formation of project teams considering alternative competence assessments under uncertainty

Oksana Kononenko, Igor Kononenko, Igbal Babayev Alican, Rasim Abdullayev Soltanaga
RADIOELECTRONIC AND COMPUTER SYSTEMS
Construction Project Management and Performance
article

Formalising the formation of project teams considering alternative competence assessments under uncertainty

Oksana Kononenko, Igor Kononenko, Igbal Babayev Alican, Rasim Abdullayev Soltanaga
article en

Abstract

The subject of this paper is mathematical models and methods of project team formation under conditions of uncertainty regarding candidates’ competences and requirements. The aim is to create an approach to formalising project team formation that considers multiple fuzzy assessments of specific candidate qualities. Tasks to be solved: to define a way of describing a set of fuzzy evaluations of specific qualities of candidates, to define a way of checking whether the candidate's qualities meet the fuzzy requirements, to propose a mathematical model of the problem, and to solve a test case. The methods used are: fuzzy set theory, multicriteria optimisation methods. The following results were obtained: it was proposed to use a trapezoidal fuzzy interval to describe the set of evaluations of specific candidate properties; to determine the compliance of candidate properties with fuzzy requirements, it was proposed to calculate the value of the requirements membership function at the point equal to the lower modal value of the fuzzy interval describing candidate properties; an example of applying the approach to solving the problem of forming a project team is considered. Conclusions. Because of the research conducted, it was proposed to describe multiple evaluations of a particular candidate property using trapezoidal fuzzy intervals. The novelty of the proposed approach lies in the method for evaluating the conformity of a set of assessments of a candidate’s qualities with fuzzy requirements. It is proposed to form a project team by maximising the sum of dominant competencies and the weighted sum of competencies, subject to constraints on the workload of the work, on the fulfilment of competency requirements and on the cost of the team’s work. The generalised function method was applied to solve the multi-criteria problem.

RADIOELECTRONIC AND COMPUTER SYSTEMSVol. 2025(2)
Openalex Percentile: Top 79%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Formalising the formation of project teams considering alternative competence assessments under uncertainty — Oksana Kononenko, Igor Kononenko, et al. · RADIOELECTRONIC AND COMPUTER SYSTEMS (2025) | TGRS Research Map | TGRS