The Effectiveness of Progressive Pruning on Looses Production

Oil palm canopy is formed every month as many as 1-3 fruits, depending on the age and growth of the plant. Each oil palm canopy supports the formation of leaf/frond positions that are arranged in a spiral. Progressive pruning of the main shoots is carried out directly by harvest workers (not the Special Main Shoot Work Team) and is carried out simultaneously when cutting the fruit while still referring to the basic principle of the number of productive fronds that must still be maintained according to the provisions (leaf area index). This study aims to determine the role of the progressive pruning system in minimizing looses (bunches and looses fruit) in oil palm plantations. The basic method used in this study is a quantitative descriptive method using t-test analysis, the parameters used are the looses of bunches and looses fruit. The conclusion of the study is that the progressive pruning system can reduce losses of oil palm fruit (bunches) and loose fruit, compared to the periodic pruning system at the overall looses point of the three looses point chains, namely at the main, plate and market.

Authors

Institutions

Publication Details

Journal
Tropical Plantation Journal
Published
2025-07-26
DOI
https://doi.org/10.56125/tpj.v4i2.64
Primary Topic
Tunneling and Rock Mechanics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The Effectiveness of Progressive Pruning on Looses Production

Herry Wirianata, Kadarwati Budihardjo, Bima Sakti Novi Tri Nugraha
Tropical Plantation Journal
Tunneling and Rock Mechanics
article

The Effectiveness of Progressive Pruning on Looses Production

Herry Wirianata, Kadarwati Budihardjo, Bima Sakti Novi Tri Nugraha
article en

Abstract

Oil palm canopy is formed every month as many as 1-3 fruits, depending on the age and growth of the plant. Each oil palm canopy supports the formation of leaf/frond positions that are arranged in a spiral. Progressive pruning of the main shoots is carried out directly by harvest workers (not the Special Main Shoot Work Team) and is carried out simultaneously when cutting the fruit while still referring to the basic principle of the number of productive fronds that must still be maintained according to the provisions (leaf area index). This study aims to determine the role of the progressive pruning system in minimizing looses (bunches and looses fruit) in oil palm plantations. The basic method used in this study is a quantitative descriptive method using t-test analysis, the parameters used are the looses of bunches and looses fruit. The conclusion of the study is that the progressive pruning system can reduce losses of oil palm fruit (bunches) and loose fruit, compared to the periodic pruning system at the overall looses point of the three looses point chains, namely at the main, plate and market.

Tropical Plantation JournalVol. 4(2)
Institut Pertanian Stiper (ID)
Openalex Percentile: Top 81%
Tunneling and Rock Mechanics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.