Experiment investigation of scour and self-burial of sagging subsea pipelines in steady current

Fundamental mechanisms of the self-burial process of a subsea pipeline that fully sags into a scour hole and the effects of the timing of pipeline sagging on the self-burial are investigated experimentally. Each self-burial experiment starts with an initial scour hole that is generated by a scour experiment for a particular time, which is defined as the touchdown time T td . The effects of the touchdown time on the self-burial process are discussed. It was found that, to achieve self-burial, the touchdown time must be delayed to allow a sufficiently deep scour hole to develop. If the touchdown time is too soon, the scour will continue after the pipeline touches down and self-burial will not happen. After touchdown, self-burial initialises at the downstream side of the pipeline and has two stages: pre-self-burial scour and self-burial. The scoured sand behind the pipeline during pre-self-burial scour form a sand dune behind the pipeline and this sand dune is the key mechanisms of self-burial. The growth of this sand dune slows down the flow through the gap and finally stops the scour. Flow visualisation of a sagging pipeline was also conducted using the Particle Image Velocimetry method to understand the flow mechanism at different stages of the self-burial process. If the scour is allowed to fully develop, the pipeline can sag into the scour hole to a vertical distance of 0.7 D before self-burial occurs, where D is diameter of pipeline. Based on the visualisation, recirculation of flow downstream to the pipeline plays a significant role in backfilling in the self-burial process. • The complete self-burial process and its mechanisms of subsea pipeline was investigated. • Self-burial initiates from downstream pipeline. • The formation of the sand dune was the key mechanism of the self-burial. • Self-burial only occurs when a pipeline sags a scour pit with sufficient depth.

Authors

Institutions

Publication Details

Journal
Ocean Engineering
Published
2025-07-26
DOI
https://doi.org/10.1016/j.oceaneng.2025.122211
Primary Topic
Offshore Engineering and Technologies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Experiment investigation of scour and self-burial of sagging subsea pipelines in steady current

Adnan Munir, Vatsal Dhamelia, Ming Long Zhao, Heath Palmer et al.
Ocean Engineering
Offshore Engineering and Technologies
article

Experiment investigation of scour and self-burial of sagging subsea pipelines in steady current

Adnan Munir, Vatsal Dhamelia, Ming Long Zhao, Heath Palmer, Pan Hu
article en

Abstract

Fundamental mechanisms of the self-burial process of a subsea pipeline that fully sags into a scour hole and the effects of the timing of pipeline sagging on the self-burial are investigated experimentally. Each self-burial experiment starts with an initial scour hole that is generated by a scour experiment for a particular time, which is defined as the touchdown time T td . The effects of the touchdown time on the self-burial process are discussed. It was found that, to achieve self-burial, the touchdown time must be delayed to allow a sufficiently deep scour hole to develop. If the touchdown time is too soon, the scour will continue after the pipeline touches down and self-burial will not happen. After touchdown, self-burial initialises at the downstream side of the pipeline and has two stages: pre-self-burial scour and self-burial. The scoured sand behind the pipeline during pre-self-burial scour form a sand dune behind the pipeline and this sand dune is the key mechanisms of self-burial. The growth of this sand dune slows down the flow through the gap and finally stops the scour. Flow visualisation of a sagging pipeline was also conducted using the Particle Image Velocimetry method to understand the flow mechanism at different stages of the self-burial process. If the scour is allowed to fully develop, the pipeline can sag into the scour hole to a vertical distance of 0.7 D before self-burial occurs, where D is diameter of pipeline. Based on the visualisation, recirculation of flow downstream to the pipeline plays a significant role in backfilling in the self-burial process. • The complete self-burial process and its mechanisms of subsea pipeline was investigated. • Self-burial initiates from downstream pipeline. • The formation of the sand dune was the key mechanism of the self-burial. • Self-burial only occurs when a pipeline sags a scour pit with sufficient depth.

Ocean EngineeringVol. 340
Western Sydney University (AU)
Life below water
Openalex Percentile: Top 78%
Offshore Engineering and Technologies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.