Dynamic Multiobjective Optimization Model for Construction Site Layout in Prefabricated Projects

Construction sites in prefabricated construction projects face significant challenges in construction site layout planning (CSLP) because of the simultaneous operation of multiple lifting equipment and the handling of large, heavy components. With the complex and dynamic nature of these construction sites, existing models have yet to fully address the issue of competition for optimal facility locations, even when facilities do not coexist on-site at the same time. This study proposes a dynamic multiobjective optimization model for the CSLP problem in prefabricated construction projects, incorporating the actual existence time of facilities to balance two key objectives: minimizing the hoisting time of the tower crane and reducing potential hazards posed by facilities. The Pareto-optimal solutions are obtained using the oMOAHA algorithm, which enhances the exploration process during initialization and mitigates the risk of local optimization. A prefabricated steel structure project is used to evaluate the effectiveness of the proposed model in two scenarios: a fixed construction schedule and a modified construction schedule during the construction process. The results demonstrate that the proposed model outperforms previous approaches in terms of both objective function value and the number of solutions found. This study provides an effective solution for optimizing available space on construction sites, enabling new facilities to fully reuse locations vacated by previous facilities—an issue not adequately addressed by static and phased approaches in multiobjective trade-offs. Furthermore, the approach presented in this study offers a viable solution for adapting to construction schedule changes during the project, a challenge that has not been effectively addressed in previous research. As a result, this study advances optimization methods for CSLP problems in construction management and provides a solid foundation for future research in more complex construction projects.

Authors

Institutions

Publication Details

Journal
Journal of Construction Engineering and Management
Published
2025-07-26
DOI
https://doi.org/10.1061/jcemd4.coeng-16856
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Dynamic Multiobjective Optimization Model for Construction Site Layout in Prefabricated Projects

Vu Hong Son Pham, Duy Hoang Pham
Journal of Construction Engineering and Management
BIM and Construction Integration
article

Dynamic Multiobjective Optimization Model for Construction Site Layout in Prefabricated Projects

Vu Hong Son Pham, Duy Hoang Pham
article en

Abstract

Construction sites in prefabricated construction projects face significant challenges in construction site layout planning (CSLP) because of the simultaneous operation of multiple lifting equipment and the handling of large, heavy components. With the complex and dynamic nature of these construction sites, existing models have yet to fully address the issue of competition for optimal facility locations, even when facilities do not coexist on-site at the same time. This study proposes a dynamic multiobjective optimization model for the CSLP problem in prefabricated construction projects, incorporating the actual existence time of facilities to balance two key objectives: minimizing the hoisting time of the tower crane and reducing potential hazards posed by facilities. The Pareto-optimal solutions are obtained using the oMOAHA algorithm, which enhances the exploration process during initialization and mitigates the risk of local optimization. A prefabricated steel structure project is used to evaluate the effectiveness of the proposed model in two scenarios: a fixed construction schedule and a modified construction schedule during the construction process. The results demonstrate that the proposed model outperforms previous approaches in terms of both objective function value and the number of solutions found. This study provides an effective solution for optimizing available space on construction sites, enabling new facilities to fully reuse locations vacated by previous facilities—an issue not adequately addressed by static and phased approaches in multiobjective trade-offs. Furthermore, the approach presented in this study offers a viable solution for adapting to construction schedule changes during the project, a challenge that has not been effectively addressed in previous research. As a result, this study advances optimization methods for CSLP problems in construction management and provides a solid foundation for future research in more complex construction projects.

Journal of Construction Engineering and ManagementVol. 151(10)
Vietnam National University Ho Chi Minh City (VN)
Sustainable cities and communities
Openalex Percentile: Top 81%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.