Application of Risk Assessment Methods in the Construction Phase of Large-Span Bridges

The construction of large-span bridges represents the technological level of bridge construction in a country, and plays a positive role in the country's economic development and technological advancement. However, there are many problems in the construction of large-span bridges, such as wind vibration during the construction phase, management of personnel, equipment, and materials, and environmental impacts during the construction period. Applying risk assessment methods to the construction phase of large-span bridges can effectively solve these problems, and risk assessment provides scientific basis for bridge design optimization, construction decision-making, and operation and maintenance management, improving the safety and durability of large-span bridges, and has important theoretical value and practical significance for ensuring the sustainable development of bridge engineering. This article analyzes the application of three cutting-edge risk assessment methods in the construction phase of large-span bridges through examples. The current risk assessment methods still have certain limitations, and this article explores and reflects on the future development direction of risk assessment systems.

Authors

Institutions

Publication Details

Journal
Applied and Computational Engineering
Published
2025-07-24
DOI
https://doi.org/10.54254/2755-2721/2025.mh25468
Primary Topic
Concrete Corrosion and Durability
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Application of Risk Assessment Methods in the Construction Phase of Large-Span Bridges

Wenhui Zhang
Applied and Computational Engineering
Concrete Corrosion and Durability
article

Application of Risk Assessment Methods in the Construction Phase of Large-Span Bridges

Wenhui Zhang
article en

Abstract

The construction of large-span bridges represents the technological level of bridge construction in a country, and plays a positive role in the country's economic development and technological advancement. However, there are many problems in the construction of large-span bridges, such as wind vibration during the construction phase, management of personnel, equipment, and materials, and environmental impacts during the construction period. Applying risk assessment methods to the construction phase of large-span bridges can effectively solve these problems, and risk assessment provides scientific basis for bridge design optimization, construction decision-making, and operation and maintenance management, improving the safety and durability of large-span bridges, and has important theoretical value and practical significance for ensuring the sustainable development of bridge engineering. This article analyzes the application of three cutting-edge risk assessment methods in the construction phase of large-span bridges through examples. The current risk assessment methods still have certain limitations, and this article explores and reflects on the future development direction of risk assessment systems.

Applied and Computational EngineeringVol. 156(1)
Jilin Jianzhu University (CN)
Openalex Percentile: Top 81%
Concrete Corrosion and Durability
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.