COMPLEX ANALYSIS OF TYPICAL VIOLATIONS OF REGULATORY REQUIREMENTS FOR ESTABLISHING BOUNDARIES OF LAND PLOTS OF ELECTRIC POWER FACILITIES

The modern energy infrastructure of Ukraine is an important component of the critical infrastructure of the state, ensuring the stable functioning of the national economy, public administration, the social sphere, and the vital activities of the population. One of the key prerequisites for the effective functioning of such facilities is a legally formalized, precisely defined and cadastrally recorded right to the land plots on which these facilities are located. Typical violations of regulatory requirements for establishing boundaries of land plots of energy facilities include: lack of state registration of the land plot; establishment of boundaries without proper geodetic surveying; use of the land plot without title documents; reduction of the area of the plot or its unauthorized alienation; violation of the establishment of sanitary protection or security zones; violation of the use of land management documentation; inconsistency of the intended purpose – the land plot has an inappropriate intended purpose, for example: "agricultural purpose" instead of "energy land". The article proposes to legislate a simplified procedure for establishing land easements for access to energy facilities, which will facilitate prompt maintenance and repair. Modern challenges associated with the management of critical infrastructure lands, especially in martial law, require the use of advanced technologies to increase the accuracy and efficiency of land management works. Energy facilities have a complex spatial configuration, which requires accurate mapping and data integration into the State Land Cadastre. Currently, the use of GIS in land management practice in Ukraine is limited, which reduces the efficiency of data processing and complicates monitoring of the condition of critical infrastructure lands. Effective management of critical infrastructure lands requires close cooperation between NPC Ukrenergo, the State Service for Geodesy, Cartography and Geocadastre, local authorities and certified land managers. Currently, the lack of coordination leads to delays in the approval of documentation, inconsistencies in data in the State Land Cadastre and violations of work deadlines. The implementation of GIS and digital technologies not only optimizes land management processes, but also increases the security of land management facilities, which is especially relevant in conditions of martial law. Strengthening coordination and improving the skills of land managers will contribute to improving the quality of land management work, reducing risks to the security of electric power facilities, and ensuring compliance with legislative requirements.

Authors

Institutions

Publication Details

Journal
Municipal economy of cities
Published
2025-07-04
DOI
https://doi.org/10.33042/2522-1809-2025-3-191-447-452
Primary Topic
Industrial Engineering and Technologies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

COMPLEX ANALYSIS OF TYPICAL VIOLATIONS OF REGULATORY REQUIREMENTS FOR ESTABLISHING BOUNDARIES OF LAND PLOTS OF ELECTRIC POWER FACILITIES

М. Pilicheva
Municipal economy of cities
Industrial Engineering and Technologies
article

COMPLEX ANALYSIS OF TYPICAL VIOLATIONS OF REGULATORY REQUIREMENTS FOR ESTABLISHING BOUNDARIES OF LAND PLOTS OF ELECTRIC POWER FACILITIES

М. Pilicheva
article en

Abstract

The modern energy infrastructure of Ukraine is an important component of the critical infrastructure of the state, ensuring the stable functioning of the national economy, public administration, the social sphere, and the vital activities of the population. One of the key prerequisites for the effective functioning of such facilities is a legally formalized, precisely defined and cadastrally recorded right to the land plots on which these facilities are located. Typical violations of regulatory requirements for establishing boundaries of land plots of energy facilities include: lack of state registration of the land plot; establishment of boundaries without proper geodetic surveying; use of the land plot without title documents; reduction of the area of the plot or its unauthorized alienation; violation of the establishment of sanitary protection or security zones; violation of the use of land management documentation; inconsistency of the intended purpose – the land plot has an inappropriate intended purpose, for example: "agricultural purpose" instead of "energy land". The article proposes to legislate a simplified procedure for establishing land easements for access to energy facilities, which will facilitate prompt maintenance and repair. Modern challenges associated with the management of critical infrastructure lands, especially in martial law, require the use of advanced technologies to increase the accuracy and efficiency of land management works. Energy facilities have a complex spatial configuration, which requires accurate mapping and data integration into the State Land Cadastre. Currently, the use of GIS in land management practice in Ukraine is limited, which reduces the efficiency of data processing and complicates monitoring of the condition of critical infrastructure lands. Effective management of critical infrastructure lands requires close cooperation between NPC Ukrenergo, the State Service for Geodesy, Cartography and Geocadastre, local authorities and certified land managers. Currently, the lack of coordination leads to delays in the approval of documentation, inconsistencies in data in the State Land Cadastre and violations of work deadlines. The implementation of GIS and digital technologies not only optimizes land management processes, but also increases the security of land management facilities, which is especially relevant in conditions of martial law. Strengthening coordination and improving the skills of land managers will contribute to improving the quality of land management work, reducing risks to the security of electric power facilities, and ensuring compliance with legislative requirements.

Municipal economy of citiesVol. 3(191)
O.M. Beketov National University of Urban Economy in Kharkiv (UA)
Openalex Percentile: Top 82%
Industrial Engineering and Technologies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.