Research on optimization of C4 repair operation of Harmony electric locomotive based on preventive maintenance

Harmonious High-Power AC Electric Locomotive, as the main type of locomotive for freight transport in China, the safety of its operation and maintenance issues have been the focus of great attention by the operation department. How to reduce the high maintenance cost and shorten the time-consuming long maintenance is a pressing issue for the operation management. In this paper, for the C4 repair operation of the harmonious electric locomotive, using the preventive maintenance method, we constructed a multi-component maintenance plan optimization model with the aim of maximizing the availability, and solved it by using a heuristic genetic algorithm. On this basis, component-specific maintenance schedules were developed based on reliability thresholds. The results of the study showed that the preventive maintenance approach resulted in a 51.04% reduction in total cost and a 7.89% increase in availability over the same operating cycle compared to the traditional fixed repair schedule maintenance program. Under the premise of ensuring locomotive operational safety, it effectively saves costs, reduces maintenance downtime and achieves the objective of improving the quality of C4 repairs.

Authors

Institutions

Publication Details

Journal
PLoS ONE
Published
2025-07-24
DOI
https://doi.org/10.1371/journal.pone.0328399
Primary Topic
Reliability and Maintenance Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on optimization of C4 repair operation of Harmony electric locomotive based on preventive maintenance

Qingxiang Wu, Yihan Liu, Jieping Wu
PLoS ONE
Reliability and Maintenance Optimization
article

Research on optimization of C4 repair operation of Harmony electric locomotive based on preventive maintenance

Qingxiang Wu, Yihan Liu, Jieping Wu
article en

Abstract

Harmonious High-Power AC Electric Locomotive, as the main type of locomotive for freight transport in China, the safety of its operation and maintenance issues have been the focus of great attention by the operation department. How to reduce the high maintenance cost and shorten the time-consuming long maintenance is a pressing issue for the operation management. In this paper, for the C4 repair operation of the harmonious electric locomotive, using the preventive maintenance method, we constructed a multi-component maintenance plan optimization model with the aim of maximizing the availability, and solved it by using a heuristic genetic algorithm. On this basis, component-specific maintenance schedules were developed based on reliability thresholds. The results of the study showed that the preventive maintenance approach resulted in a 51.04% reduction in total cost and a 7.89% increase in availability over the same operating cycle compared to the traditional fixed repair schedule maintenance program. Under the premise of ensuring locomotive operational safety, it effectively saves costs, reduces maintenance downtime and achieves the objective of improving the quality of C4 repairs.

PLoS ONEVol. 20(7)
East China Jiaotong University (CN)
Openalex Percentile: Top 78%
Reliability and Maintenance Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Research on optimization of C4 repair operation of Harmony electric locomotive based on preventive maintenance — Qingxiang Wu, Yihan Liu, et al. · PLoS ONE (2025) | TGRS Research Map | TGRS