Modelling and availability optimisation of zinc plating process by using particle swarm optimisation

The main aim of this paper is to increase the productivity and reduce the maintenance cost of systems in process industries. Markov modelling is used for mathematical modelling, and steady state as well as transition state availability of various subsystems is analysed for finding the critical subsystem in a production process. The zinc plating process within the screw manufacturing industry is considered as a case study for optimising the availability of the system. The considered system comprises repairable subsystems organised in mixed configurations, assuming their performance parameters like failure and repair rates follow exponential distributions. To solve these equations, a numerical method, specifically the Runge-Kutta fourth-order method, is employed and MATLAB software is utilised for numerical computations. To optimise the results, a Particle Swarm Optimisation technique is used for optimising the availability of the system for various performance parameters and the results are helpful for planning the maintenance policy of the plant.

Authors

Institutions

Publication Details

Journal
International Journal of Reliability and Safety
Published
2025-01-01
DOI
https://doi.org/10.1504/ijrs.2025.147348
Primary Topic
Metal Forming Simulation Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Modelling and availability optimisation of zinc plating process by using particle swarm optimisation

Ajay Kumar, Devender Singh Punia
International Journal of Reliability and Safety
Metal Forming Simulation Techniques
article

Modelling and availability optimisation of zinc plating process by using particle swarm optimisation

Ajay Kumar, Devender Singh Punia
article en

Abstract

The main aim of this paper is to increase the productivity and reduce the maintenance cost of systems in process industries. Markov modelling is used for mathematical modelling, and steady state as well as transition state availability of various subsystems is analysed for finding the critical subsystem in a production process. The zinc plating process within the screw manufacturing industry is considered as a case study for optimising the availability of the system. The considered system comprises repairable subsystems organised in mixed configurations, assuming their performance parameters like failure and repair rates follow exponential distributions. To solve these equations, a numerical method, specifically the Runge-Kutta fourth-order method, is employed and MATLAB software is utilised for numerical computations. To optimise the results, a Particle Swarm Optimisation technique is used for optimising the availability of the system for various performance parameters and the results are helpful for planning the maintenance policy of the plant.

International Journal of Reliability and SafetyVol. 19(3)
Deenbandhu Chhotu Ram University of Science and Technology (IN), Government of Haryana (IN)
Openalex Percentile: Top 82%
Metal Forming Simulation Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Modelling and availability optimisation of zinc plating process by using particle swarm optimisation — Ajay Kumar, Devender Singh Punia · International Journal of Reliability and Safety (2025) | TGRS Research Map | TGRS