Exploring the “1 + N” Management Model for Construction Project Archives

传统的建设工程项目档案管理要求建设单位、施工单位和地方档案馆各自保存一套档案,导致资源浪费和管理效率低下。本文探讨了“1 + N (1套纸质N套电子)”管理模式的可行性,即只交一套原始档案到地方档案馆,档案馆和所有参建单位各保存一套电子版,保障档案的真实性和权威性。本文分析了其优势、实施路径及可能面临的挑战,并提出了相应的解决方案,以期为建设工程项目档案管理的优化提供参考。The traditional construction project archives management requires the construction unit, the contractor, and the local archives to preserve a set of documents for each, resulting in the waste of resource and low efficiency of management. This paper explores the feasibility of the “1 + N” (one original several copies)’ management model, where only one set of original archives is submitted to the local archives. The local archives and all project participants keep a set of copies. Which can assure the authenticity and authority of archives. It analyzes the advantages, implementation pathways, and potential challenges of this approach, and proposes corresponding solutions, aiming to provide a reference for optimizing construction project archive management.

Authors

Publication Details

Journal
Service Science and Management
Published
2025-01-01
DOI
https://doi.org/10.12677/ssem.2025.144067
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Exploring the “1 + N” Management Model for Construction Project Archives

鹏飞 李
Service Science and Management
BIM and Construction Integration
article

Exploring the “1 + N” Management Model for Construction Project Archives

鹏飞 李
article en

Abstract

传统的建设工程项目档案管理要求建设单位、施工单位和地方档案馆各自保存一套档案,导致资源浪费和管理效率低下。本文探讨了“1 + N (1套纸质N套电子)”管理模式的可行性,即只交一套原始档案到地方档案馆,档案馆和所有参建单位各保存一套电子版,保障档案的真实性和权威性。本文分析了其优势、实施路径及可能面临的挑战,并提出了相应的解决方案,以期为建设工程项目档案管理的优化提供参考。The traditional construction project archives management requires the construction unit, the contractor, and the local archives to preserve a set of documents for each, resulting in the waste of resource and low efficiency of management. This paper explores the feasibility of the “1 + N” (one original several copies)’ management model, where only one set of original archives is submitted to the local archives. The local archives and all project participants keep a set of copies. Which can assure the authenticity and authority of archives. It analyzes the advantages, implementation pathways, and potential challenges of this approach, and proposes corresponding solutions, aiming to provide a reference for optimizing construction project archive management.

Service Science and ManagementVol. 14(04)
Openalex Percentile: Top 81%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.