Non-conformance and Correction Costs in Construction: Insights from Actual Practice
The corrective actions applied to non-conforming products—commonly termed rework—can substantially erode a construction organization's performance, productivity, and profitability. Yet empirical knowledge of the actual cost of rework in the field remains sparse. This study quantifies rework costs across 12 completed transport-infrastructure projects (with a total contract value of AU$2 billion) delivered via an alliance-based program. We find that 61 % of all non-conformances (656 of 1,064) required rework, with an average rework cost equal to 0.34 % of each project's contract value. Notably, a single project accounted for 57% of the total rework expenditure and 31% of the issued non-conformances. This paper thus (1) offers new, data-driven insights into the actual costs of rework on major infrastructure works and (2) demonstrates that rework incidence and its financial impact vary widely across projects.
Authors
- Peter E.D. Love (ORCID: https://orcid.org/0000-0002-3239-1304)
- Jane Matthews (ORCID: https://orcid.org/0000-0003-3367-9278)
Institutions
- Deakin University (AU)
- Curtin University (AU)
Publication Details
- Journal
- IEEE Engineering Management Review
- Published
- 2025-01-01
- DOI
- https://doi.org/10.1109/emr.2025.3591478
- Primary Topic
- Construction Project Management and Performance
- Type
- article
- Field-Weighted Citation Impact
- 0.00