Process Optimization for Complex Product Assembly Workshops with AGV Integration via Discrete Event Simulation

For complex assembly workshops, optimizing AGV scheduling is critical to enhancing production efficiency and resource utilization. Traditional scheduling methods often rely on fixed priority rules and basic path planning algorithms, which are insufficient to accommodate the dynamic changes in resource availability and task demands. To overcome these limitations, this study proposes a DES-based optimization approach that dynamically adjusts AGV task allocation and path planning to improve scheduling performance in complex manufacturing environments. By integrating lean production principles with intelligent simulation technologies, a comprehensive simulation model was developed using the Plant Simulation platform. This model simulates the coordination between AGVs and workstations while optimizing workstation layout and material flow. Simulation results demonstrate that the proposed approach significantly improves AGV scheduling efficiency and overall production performance. Notably, workstation utilization increased from below 6% to over 28%, while the work-in-progress rate dropped from 94% to under 74%. This study offers a practical and effective AGV scheduling strategy for complex product assembly workshops, with strong potential for real-world implementation.

Authors

Institutions

Publication Details

Journal
Applied Sciences
Published
2025-07-19
DOI
https://doi.org/10.3390/app15148051
Primary Topic
Assembly Line Balancing Optimization
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Process Optimization for Complex Product Assembly Workshops with AGV Integration via Discrete Event Simulation

Zhigang Xu, Shengluo Yang, Shuoxin Yin, Hailong Song
Applied Sciences
Assembly Line Balancing Optimization
article

Process Optimization for Complex Product Assembly Workshops with AGV Integration via Discrete Event Simulation

Zhigang Xu, Shengluo Yang, Shuoxin Yin, Hailong Song
article en

Abstract

For complex assembly workshops, optimizing AGV scheduling is critical to enhancing production efficiency and resource utilization. Traditional scheduling methods often rely on fixed priority rules and basic path planning algorithms, which are insufficient to accommodate the dynamic changes in resource availability and task demands. To overcome these limitations, this study proposes a DES-based optimization approach that dynamically adjusts AGV task allocation and path planning to improve scheduling performance in complex manufacturing environments. By integrating lean production principles with intelligent simulation technologies, a comprehensive simulation model was developed using the Plant Simulation platform. This model simulates the coordination between AGVs and workstations while optimizing workstation layout and material flow. Simulation results demonstrate that the proposed approach significantly improves AGV scheduling efficiency and overall production performance. Notably, workstation utilization increased from below 6% to over 28%, while the work-in-progress rate dropped from 94% to under 74%. This study offers a practical and effective AGV scheduling strategy for complex product assembly workshops, with strong potential for real-world implementation.

Applied SciencesVol. 15(14)
Shenyang Institute of Automation (CN), University of Shanghai for Science and Technology (CN), Chinese Academy of Sciences (CN), University of Chinese Academy of Sciences (CN)
National Key Research and Development Program of China
Openalex Percentile: Top 75%
Assembly Line Balancing Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Process Optimization for Complex Product Assembly Workshops with AGV Integration via Discrete Event Simulation — Zhigang Xu, Shengluo Yang, et al. · Applied Sciences (2025) | TGRS Research Map | TGRS