Analisis Perbandingan Produktivitas dan Value Engineering pada Pelaksanaan Pekerjaan Pemasangan Bata Merah dan Bata Ringan

The selection of building materials is vital for the development of high-quality infrastructure and residential projects. The two most commonly used building materials are red bricks and lightweight bricks. This study compares the productivity and cost of red brick and lightweight brick production and installation in construction projects. Data were obtained through direct observation, worker interviews, and Value Engineering analysis on the Shopee Semanggi Housing Project, which consists of 136 houses with a total estimated budget (RAB) of Rp10.93 billion. The results show that red brick installation productivity is 3.3 m²/day, while lightweight brick installation reaches 17.9 m²/day. The installation cost for red bricks is Rp1.52 billion for 12,786.78 m², compared to Rp1.62 billion for lightweight bricks for the same area. This study provides guidance for selecting building materials based on time and cost efficiency.

Authors

Institutions

Publication Details

Journal
Konstruksi Publikasi Ilmu Teknik Perencanaan Tata Ruang dan Teknik Sipil
Published
2025-03-06
DOI
https://doi.org/10.61132/konstruksi.v3i2.776
Primary Topic
Agriculture and Agroindustry Studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analisis Perbandingan Produktivitas dan Value Engineering pada Pelaksanaan Pekerjaan Pemasangan Bata Merah dan Bata Ringan

Koosdaryani Soeryodarundio, Ary Setyawan, Ivan Fadhila
Konstruksi Publikasi Ilmu Teknik Perencanaan Tata Ruang dan Teknik Sipil
Agriculture and Agroindustry Studies
article

Analisis Perbandingan Produktivitas dan Value Engineering pada Pelaksanaan Pekerjaan Pemasangan Bata Merah dan Bata Ringan

Koosdaryani Soeryodarundio, Ary Setyawan, Ivan Fadhila
article en

Abstract

The selection of building materials is vital for the development of high-quality infrastructure and residential projects. The two most commonly used building materials are red bricks and lightweight bricks. This study compares the productivity and cost of red brick and lightweight brick production and installation in construction projects. Data were obtained through direct observation, worker interviews, and Value Engineering analysis on the Shopee Semanggi Housing Project, which consists of 136 houses with a total estimated budget (RAB) of Rp10.93 billion. The results show that red brick installation productivity is 3.3 m²/day, while lightweight brick installation reaches 17.9 m²/day. The installation cost for red bricks is Rp1.52 billion for 12,786.78 m², compared to Rp1.62 billion for lightweight bricks for the same area. This study provides guidance for selecting building materials based on time and cost efficiency.

Konstruksi Publikasi Ilmu Teknik Perencanaan Tata Ruang dan Teknik SipilVol. 3(2)
Sebelas Maret University (ID)
Openalex Percentile: Top 73%
Agriculture and Agroindustry Studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analisis Perbandingan Produktivitas dan Value Engineering pada Pelaksanaan Pekerjaan Pemasangan Bata Merah dan Bata Ringan — Koosdaryani Soeryodarundio, Ary Setyawan, et al. · Konstruksi Publikasi Ilmu Teknik Perencanaan Tata Ruang dan Teknik Sipil (2025) | TGRS Research Map | TGRS