Pengembangan Model Estimasi Konseptual Biaya Pembangunan Gedung Rumah Sakit Menggunakan Cost Significant Model

Implementation of the hospital building project, have a ways of estimation in accordance with the phases of the project. In the early stages of project planning, (owner) requires the estimated cost to construct the project budget. So it is necessary to develop cost estimation model that is easy to use, accurate and reliable. This research planning to develop a model estimation on stage initial project planning, easy with a fairly accurate result. Development method uses the principle of " Cost Significant Model" and the multiple linear regression. 6 data obtained using the method of work packages BoQ (Bill of Quantity) hospital building with details of data among 5 work packages that have been realized from fiscal year 2011 - 2014 were compared with 1 package of work to be performed

Authors

Institutions

Publication Details

Journal
Konstruksi Publikasi Ilmu Teknik Perencanaan Tata Ruang dan Teknik Sipil
Published
2025-03-10
DOI
https://doi.org/10.61132/konstruksi.v3i2.777
Primary Topic
Geotechnical and construction materials studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Pengembangan Model Estimasi Konseptual Biaya Pembangunan Gedung Rumah Sakit Menggunakan Cost Significant Model

Cosmas P.Y. Pao Effi, Stefanus Rada, Putu A.A. Aptiyasa
Konstruksi Publikasi Ilmu Teknik Perencanaan Tata Ruang dan Teknik Sipil
Geotechnical and construction materials studies
article

Pengembangan Model Estimasi Konseptual Biaya Pembangunan Gedung Rumah Sakit Menggunakan Cost Significant Model

Cosmas P.Y. Pao Effi, Stefanus Rada, Putu A.A. Aptiyasa
article en

Abstract

Implementation of the hospital building project, have a ways of estimation in accordance with the phases of the project. In the early stages of project planning, (owner) requires the estimated cost to construct the project budget. So it is necessary to develop cost estimation model that is easy to use, accurate and reliable. This research planning to develop a model estimation on stage initial project planning, easy with a fairly accurate result. Development method uses the principle of " Cost Significant Model" and the multiple linear regression. 6 data obtained using the method of work packages BoQ (Bill of Quantity) hospital building with details of data among 5 work packages that have been realized from fiscal year 2011 - 2014 were compared with 1 package of work to be performed

Konstruksi Publikasi Ilmu Teknik Perencanaan Tata Ruang dan Teknik SipilVol. 3(2)
Universitas Dian Nusantara (ID)
Openalex Percentile: Top 81%
Geotechnical and construction materials studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.