Analisis Penjadwalan Waktu Proyek Gedung Puskesmas Ngoro Kabupaten Jombang dengan Menggunakan Metode PDM (Precedence Diagram Methode)

Time Schedule is used as a guide and control tool for work execution time and productivity of workers, work tools on the project. In terms of productivity control, there are several aspects involved in the monitoring system, such as materials, tools, resources, and scheduling of project activities. Scheduling is the arrangement of resources to complete tasks in achieving targets. by involving components of activities, and time, In order to determine the optimal scheduling and budget. in accordance with time and cost limitations, this study uses the PDM (Precedence Diagram Method) method and the Crashing method through alternative scheduling with the addition of overtime of 1 hour, 2 hours, and 3 hours and knowing the acceleration cost. for each alternative. The results of the acceleration alternative with optimal costs are, alternative 1 adding 1 hour of overtime, the total cost decreased by 0.19% to Rp 3,067,337,201, -. This means that alternative 1 saves costs of Rp 5,984,598, - and is estimated to be one day faster to 119 days.

Authors

Institutions

Publication Details

Journal
Konstruksi Publikasi Ilmu Teknik Perencanaan Tata Ruang dan Teknik Sipil
Published
2024-12-13
DOI
https://doi.org/10.61132/konstruksi.v3i1.650
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analisis Penjadwalan Waktu Proyek Gedung Puskesmas Ngoro Kabupaten Jombang dengan Menggunakan Metode PDM (Precedence Diagram Methode)

Totok Yulianto, Agus Setyawan, Titin Sundari, Meriana Wahyu Nugroho
Konstruksi Publikasi Ilmu Teknik Perencanaan Tata Ruang dan Teknik Sipil
Management and Optimization Techniques
article

Analisis Penjadwalan Waktu Proyek Gedung Puskesmas Ngoro Kabupaten Jombang dengan Menggunakan Metode PDM (Precedence Diagram Methode)

Totok Yulianto, Agus Setyawan, Titin Sundari, Meriana Wahyu Nugroho
article en

Abstract

Time Schedule is used as a guide and control tool for work execution time and productivity of workers, work tools on the project. In terms of productivity control, there are several aspects involved in the monitoring system, such as materials, tools, resources, and scheduling of project activities. Scheduling is the arrangement of resources to complete tasks in achieving targets. by involving components of activities, and time, In order to determine the optimal scheduling and budget. in accordance with time and cost limitations, this study uses the PDM (Precedence Diagram Method) method and the Crashing method through alternative scheduling with the addition of overtime of 1 hour, 2 hours, and 3 hours and knowing the acceleration cost. for each alternative. The results of the acceleration alternative with optimal costs are, alternative 1 adding 1 hour of overtime, the total cost decreased by 0.19% to Rp 3,067,337,201, -. This means that alternative 1 saves costs of Rp 5,984,598, - and is estimated to be one day faster to 119 days.

Konstruksi Publikasi Ilmu Teknik Perencanaan Tata Ruang dan Teknik SipilVol. 3(1)
Universitas Hasyim Asy'ari (ID)
Openalex Percentile: Top 47%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analisis Penjadwalan Waktu Proyek Gedung Puskesmas Ngoro Kabupaten Jombang dengan Menggunakan Metode PDM (Precedence Diagram Methode) — Totok Yulianto, Agus Setyawan, et al. · Konstruksi Publikasi Ilmu Teknik Perencanaan Tata Ruang dan Teknik Sipil (2024) | TGRS Research Map | TGRS