Analisis Keterlambatan dalam Pelaksanaan Proyek Konstruksi Rumah Hunian Dempsey Hill, Citraland Utara, Kota Surabaya

This journal examines the factors that have the potential to cause delays in the implementation of the Dempsey Hill residential housing construction project, North Citraland, Surabaya. Projects managed by CV. Tirta Kusuma has a target of completion in 10 months, but there are indications of delays that affect the schedule and costs. This study aims to identify and analyze the dominant factors causing delays, such as project management, material procurement, and human resources. The methods used include observation, questionnaire distribution, and literature study. The results of this analysis are expected to provide recommendations to improve time management, resource efficiency, and control of future construction projects. The results of data analysis in this study indicate that project delays are primarily caused by material delays and errors in work execution, as concluded based on the results of factor analysis.

Authors

Institutions

Publication Details

Journal
Konstruksi Publikasi Ilmu Teknik Perencanaan Tata Ruang dan Teknik Sipil
Published
2025-07-14
DOI
https://doi.org/10.61132/konstruksi.v3i3.983
Primary Topic
Occupational Health and Safety Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analisis Keterlambatan dalam Pelaksanaan Proyek Konstruksi Rumah Hunian Dempsey Hill, Citraland Utara, Kota Surabaya

Ridho Bayu Aji, M. Sigit Darmawan, Budi Suswanto, Yafie Abdillah Akbar et al.
Konstruksi Publikasi Ilmu Teknik Perencanaan Tata Ruang dan Teknik Sipil
Occupational Health and Safety Management
article

Analisis Keterlambatan dalam Pelaksanaan Proyek Konstruksi Rumah Hunian Dempsey Hill, Citraland Utara, Kota Surabaya

Ridho Bayu Aji, M. Sigit Darmawan, Budi Suswanto, Yafie Abdillah Akbar, Gentur Prihartono
article en

Abstract

This journal examines the factors that have the potential to cause delays in the implementation of the Dempsey Hill residential housing construction project, North Citraland, Surabaya. Projects managed by CV. Tirta Kusuma has a target of completion in 10 months, but there are indications of delays that affect the schedule and costs. This study aims to identify and analyze the dominant factors causing delays, such as project management, material procurement, and human resources. The methods used include observation, questionnaire distribution, and literature study. The results of this analysis are expected to provide recommendations to improve time management, resource efficiency, and control of future construction projects. The results of data analysis in this study indicate that project delays are primarily caused by material delays and errors in work execution, as concluded based on the results of factor analysis.

Konstruksi Publikasi Ilmu Teknik Perencanaan Tata Ruang dan Teknik SipilVol. 3(3)
Sepuluh Nopember Institute of Technology (ID)
Openalex Percentile: Top 74%
Occupational Health and Safety Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analisis Keterlambatan dalam Pelaksanaan Proyek Konstruksi Rumah Hunian Dempsey Hill, Citraland Utara, Kota Surabaya — Ridho Bayu Aji, M. Sigit Darmawan, et al. · Konstruksi Publikasi Ilmu Teknik Perencanaan Tata Ruang dan Teknik Sipil (2025) | TGRS Research Map | TGRS