Designing Optimal Government–Contractor Subsidy Policy for Promoting Modular Construction: Bilevel Stochastic Program

Modular construction (MC) is an advanced construction method that offers great economic, social, and environmental advantages over the cast-in-situ method, but the adoption rate of MC is low in practice. Government promotional policies are recognized as effective strategies to incentivize the use of MC modules (MCMs) by contractors. However, current studies devoted to the government subsidy problem are designed based on deterministic parameters. In real-life scenarios, the selling price of MCMs, the cost of cast-in-situ construction, the maximum quantity of MCMs supplied, and the construction work of future projects have many uncertainties. Neglecting these factors can result in suboptimal subsidy plans for governments and further influence the supply chain related decisions made by contractors. This study contributes to the literature by designing an optimal government subsidy allocation strategy to promote the adoption of MC technique. An innovative bilevel stochastic program was formulated that incorporates price and quantity uncertainty, and an exact solution method was developed for problem-solving. The proposed optimal subsidy allocation policy was validated using a Hong Kong case study. The results show that our plan is expected to increase the adoption rate of MC in Hong Kong to 52.3%, thereby justifying the practical contributions of our well-designed subsidy policy. Furthermore, results show that the consideration of real-life uncertainties can result in a noteworthy 38% improvement in the adoption of MC compared with the traditional deterministic method, thereby justifying the methodological contributions of this study. Through sensitivity analysis, useful managerial insights related to subsidy budget are provided for policymakers.

Authors

Institutions

Publication Details

Journal
Journal of Construction Engineering and Management
Published
2025-07-16
DOI
https://doi.org/10.1061/jcemd4.coeng-16577
Citations
1
Primary Topic
Public-Private Partnership Projects
Type
article
Field-Weighted Citation Impact
2.23
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Designing Optimal Government–Contractor Subsidy Policy for Promoting Modular Construction: Bilevel Stochastic Program

Wen Yi, Huiwen Wang, Lu Zhen, Yongze Song et al.
1 citations
Journal of Construction Engineering and Management
Public-Private Partnership Projects
2.23
article

Designing Optimal Government–Contractor Subsidy Policy for Promoting Modular Construction: Bilevel Stochastic Program

Wen Yi, Huiwen Wang, Lu Zhen, Yongze Song, Peng Wu
article en
1 citations

Abstract

Modular construction (MC) is an advanced construction method that offers great economic, social, and environmental advantages over the cast-in-situ method, but the adoption rate of MC is low in practice. Government promotional policies are recognized as effective strategies to incentivize the use of MC modules (MCMs) by contractors. However, current studies devoted to the government subsidy problem are designed based on deterministic parameters. In real-life scenarios, the selling price of MCMs, the cost of cast-in-situ construction, the maximum quantity of MCMs supplied, and the construction work of future projects have many uncertainties. Neglecting these factors can result in suboptimal subsidy plans for governments and further influence the supply chain related decisions made by contractors. This study contributes to the literature by designing an optimal government subsidy allocation strategy to promote the adoption of MC technique. An innovative bilevel stochastic program was formulated that incorporates price and quantity uncertainty, and an exact solution method was developed for problem-solving. The proposed optimal subsidy allocation policy was validated using a Hong Kong case study. The results show that our plan is expected to increase the adoption rate of MC in Hong Kong to 52.3%, thereby justifying the practical contributions of our well-designed subsidy policy. Furthermore, results show that the consideration of real-life uncertainties can result in a noteworthy 38% improvement in the adoption of MC compared with the traditional deterministic method, thereby justifying the methodological contributions of this study. Through sensitivity analysis, useful managerial insights related to subsidy budget are provided for policymakers.

Journal of Construction Engineering and ManagementVol. 151(10)
Shanghai University (CN), Shanghai University of Engineering Science (CN), Hong Kong Polytechnic University (HK), Curtin University (AU)
Openalex Percentile: Top 10%
Public-Private Partnership Projects
2.23
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.