Real-time multiobjective scheduling in hybrid flow shop base on D3QN-KAN

Rational and efficient resource scheduling in hybrid flow shop(HFS) is crucial for enhancing manufacturing efficiency. This study addresses two challenges in solving scheduling problems with deep reinforcement learning: neural network parameter redundancy, and dynamic balance optimization of multiple objectives in multi-target scheduling scenarios. We propose a D3QN-KAN-based multi-objective real-time scheduling method. By embedding Kolmogorov-Arnold Networks (KAN) into a Double Dueling Deep Q-Network(D3QN), we utilize its spline-parameterized activation functions to achieve efficient characterization of high-dimensional state spaces. A dynamic segmented reward mechanism is designed to construct nonlinear adaptive reward surfaces, combined with quadratic penalty functions to realize collaborative optimization of four-dimensional objectives including makespan. Experimental results demonstrate that in mixed-flow workshop scenarios with 10 workpiece types and 10 devices, compared to baseline models like D3QN-EfficientNet, the proposed method achieves 5.3% reduction in maximum makespan, 5.1% decrease in average makespan, 3.6% reduction in total machine costs, and 3.9% reduction in total machine load, providing efficient dynamic decision support for complex manufacturing systems.

Authors

Institutions

Publication Details

Published
2025-07-16
DOI
https://doi.org/10.1117/12.3070817
Primary Topic
Advanced Manufacturing and Logistics Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Real-time multiobjective scheduling in hybrid flow shop base on D3QN-KAN

Meilin Wang, Shihao Hu, Kejia Hu
Advanced Manufacturing and Logistics Optimization
article

Real-time multiobjective scheduling in hybrid flow shop base on D3QN-KAN

Meilin Wang, Shihao Hu, Kejia Hu
article en

Abstract

Rational and efficient resource scheduling in hybrid flow shop(HFS) is crucial for enhancing manufacturing efficiency. This study addresses two challenges in solving scheduling problems with deep reinforcement learning: neural network parameter redundancy, and dynamic balance optimization of multiple objectives in multi-target scheduling scenarios. We propose a D3QN-KAN-based multi-objective real-time scheduling method. By embedding Kolmogorov-Arnold Networks (KAN) into a Double Dueling Deep Q-Network(D3QN), we utilize its spline-parameterized activation functions to achieve efficient characterization of high-dimensional state spaces. A dynamic segmented reward mechanism is designed to construct nonlinear adaptive reward surfaces, combined with quadratic penalty functions to realize collaborative optimization of four-dimensional objectives including makespan. Experimental results demonstrate that in mixed-flow workshop scenarios with 10 workpiece types and 10 devices, compared to baseline models like D3QN-EfficientNet, the proposed method achieves 5.3% reduction in maximum makespan, 5.1% decrease in average makespan, 3.6% reduction in total machine costs, and 3.9% reduction in total machine load, providing efficient dynamic decision support for complex manufacturing systems.

Guangdong University of Technology (CN)
Openalex Percentile: Top 75%
Advanced Manufacturing and Logistics Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.