Analisis Keseimbangan Lintasan Produksi dalam Upaya Mengurangi Waktu Tunggu pada Proses Produksi Kursi (Studi Kasus: UD. XYZ)

UD. Santoso Mandiri is a company engaged in the furniture industry and applies a make-to-order system in producing chairs. The company faces an imbalance in the production line, particularly at the bending and welding stations, which leads to work accumulation. This study aims to minimize delays at workstations to achieve a balanced production line. Data were collected through observation and interviews, then analyzed using the Ranked Positional Weight and Region Approach methods. The results showed that the Ranked Positional Weight method provided more optimal outcomes, with a proposed reduction in the number of workstations from five to three. The grouping of work elements was carried out based on priority order and completion time. As a result, line efficiency increased to 72.95%, while balance delay decreased to 27.05%. This study is expected to help create a more balanced workflow and reduce delays in the production process.

Authors

Institutions

Publication Details

Journal
Jurnal Teknik Industri Terintegrasi
Published
2025-07-04
DOI
https://doi.org/10.31004/jutin.v8i3.46550
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analisis Keseimbangan Lintasan Produksi dalam Upaya Mengurangi Waktu Tunggu pada Proses Produksi Kursi (Studi Kasus: UD. XYZ)

Bima Alfiono, Siti Mundari
Jurnal Teknik Industri Terintegrasi
Management and Optimization Techniques
article

Analisis Keseimbangan Lintasan Produksi dalam Upaya Mengurangi Waktu Tunggu pada Proses Produksi Kursi (Studi Kasus: UD. XYZ)

Bima Alfiono, Siti Mundari
article en

Abstract

UD. Santoso Mandiri is a company engaged in the furniture industry and applies a make-to-order system in producing chairs. The company faces an imbalance in the production line, particularly at the bending and welding stations, which leads to work accumulation. This study aims to minimize delays at workstations to achieve a balanced production line. Data were collected through observation and interviews, then analyzed using the Ranked Positional Weight and Region Approach methods. The results showed that the Ranked Positional Weight method provided more optimal outcomes, with a proposed reduction in the number of workstations from five to three. The grouping of work elements was carried out based on priority order and completion time. As a result, line efficiency increased to 72.95%, while balance delay decreased to 27.05%. This study is expected to help create a more balanced workflow and reduce delays in the production process.

Jurnal Teknik Industri TerintegrasiVol. 8(3)
Universitas 17 Agustus 1945 Surabaya (ID)
Openalex Percentile: Top 74%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.