Analisis Total Productive Maintenance Pada Mesin Las Semi Robotik Dengan Pendekatan Metode Overall Equipment Effectiveness di PT Refindo Intiselaras

This study aims to evaluate the implementation of Total Productive Maintenance (TPM) on the Semi Robotic Welding Machine at PT Refindo Intiselaras using the Overall Equipment Effectiveness (OEE) approach to find the causes of high downtime. This study took place from January to December 2024 using data on the three main components of OEE: Availability, Performance, Quality. The analysis showed that the average value of Availability was 95.30%, Performance was 89.47%, and Quality was 99.07%, with the average OEE value reaching 84.47%. This figure has not met the international OEE standard set at 85%, with the main factors that hinder it being variations in Performance as well as a small decrease in Quality. It is recommended that the company improve supervision of machine operational speed and strengthen the implementation of TPM between divisions to achieve maximum yield value in the production process.

Authors

Institutions

Publication Details

Journal
Jurnal Teknik Industri Terintegrasi
Published
2025-07-04
DOI
https://doi.org/10.31004/jutin.v8i3.46951
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analisis Total Productive Maintenance Pada Mesin Las Semi Robotik Dengan Pendekatan Metode Overall Equipment Effectiveness di PT Refindo Intiselaras

Aan Zainal Muttaqin, Doni Susanto, Rifqi Wahyu Ichwannudin
Jurnal Teknik Industri Terintegrasi
Management and Optimization Techniques
article

Analisis Total Productive Maintenance Pada Mesin Las Semi Robotik Dengan Pendekatan Metode Overall Equipment Effectiveness di PT Refindo Intiselaras

Aan Zainal Muttaqin, Doni Susanto, Rifqi Wahyu Ichwannudin
article en

Abstract

This study aims to evaluate the implementation of Total Productive Maintenance (TPM) on the Semi Robotic Welding Machine at PT Refindo Intiselaras using the Overall Equipment Effectiveness (OEE) approach to find the causes of high downtime. This study took place from January to December 2024 using data on the three main components of OEE: Availability, Performance, Quality. The analysis showed that the average value of Availability was 95.30%, Performance was 89.47%, and Quality was 99.07%, with the average OEE value reaching 84.47%. This figure has not met the international OEE standard set at 85%, with the main factors that hinder it being variations in Performance as well as a small decrease in Quality. It is recommended that the company improve supervision of machine operational speed and strengthen the implementation of TPM between divisions to achieve maximum yield value in the production process.

Jurnal Teknik Industri TerintegrasiVol. 8(3)
Universitas PGRI Madiun (ID)
Openalex Percentile: Top 74%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analisis Total Productive Maintenance Pada Mesin Las Semi Robotik Dengan Pendekatan Metode Overall Equipment Effectiveness di PT Refindo Intiselaras — Aan Zainal Muttaqin, Doni Susanto, et al. · Jurnal Teknik Industri Terintegrasi (2025) | TGRS Research Map | TGRS