Penerapan Metode Lean Six Sigma (DMAIC) untuk Meningkatkan Produktivitas Plat Silinder di PT. X

PT. X is a manufacturing company that produces fire extinguishers (APAR), where cylindrical plate welding is a critical process. However, the process is often inefficient due to several non-value-added steps. This study aims to improve welding productivity using Lean Six Sigma through the DMAIC (Define, Measure, Analyze, Improve, Control) approach and by measuring Overall Equipment Effectiveness (OEE). The initial OEE value was 67.49%, far below the world-class standard of 85%. Pareto analysis showed the highest downtime was due to cycle time issues, especially during setup and cutting of additional plates. Improvements were made by eliminating the cutting process and adding a stopper to ensure accurate welding positions. These changes reduced the cycle time from 180 seconds to 120 seconds and increased the OEE to 76.12%.

Authors

Institutions

Publication Details

Journal
Jurnal Teknik Industri Terintegrasi
Published
2025-07-04
DOI
https://doi.org/10.31004/jutin.v8i3.47306
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Penerapan Metode Lean Six Sigma (DMAIC) untuk Meningkatkan Produktivitas Plat Silinder di PT. X

Fadyla Indra Kusuma, Ade Nurul Hidayat, Hafidz Akbar Halim
Jurnal Teknik Industri Terintegrasi
Management and Optimization Techniques
article

Penerapan Metode Lean Six Sigma (DMAIC) untuk Meningkatkan Produktivitas Plat Silinder di PT. X

Fadyla Indra Kusuma, Ade Nurul Hidayat, Hafidz Akbar Halim
article en

Abstract

PT. X is a manufacturing company that produces fire extinguishers (APAR), where cylindrical plate welding is a critical process. However, the process is often inefficient due to several non-value-added steps. This study aims to improve welding productivity using Lean Six Sigma through the DMAIC (Define, Measure, Analyze, Improve, Control) approach and by measuring Overall Equipment Effectiveness (OEE). The initial OEE value was 67.49%, far below the world-class standard of 85%. Pareto analysis showed the highest downtime was due to cycle time issues, especially during setup and cutting of additional plates. Improvements were made by eliminating the cutting process and adding a stopper to ensure accurate welding positions. These changes reduced the cycle time from 180 seconds to 120 seconds and increased the OEE to 76.12%.

Jurnal Teknik Industri TerintegrasiVol. 8(3)
Universitas Nusa Bangsa (ID), Universitas Pelita Bangsa
Openalex Percentile: Top 74%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.