Relayout Lantai Produksi Tenda Guna Meminimasi Jarak Perpindahan Material

CV. XYZ is a tent manufacturing company based in Surabaya facing issues with its production facility layout, which does not follow the actual production flow. This results in long material handling distances and inefficient workflow. This study aims to redesign the layout to minimize material movement distances and optimize space utilization. The methods used include observation, interviews, the creation of an Operation Process Chart, Multi Product Process Chart, From-To Chart, Systematic Layout Planning analysis, and simulation using FlexSim software. The research sample includes all workstations on the production floor of CV. XYZ. The results show that proposed layout 2 reduces the Material Handling burden by 29.01% and increases space utilization from 46.52 m² to 88.55 m². It is recommended that the company implement the proposed layout to enhance production efficiency.

Authors

Institutions

Publication Details

Journal
Jurnal Teknik Industri Terintegrasi
Published
2025-07-04
DOI
https://doi.org/10.31004/jutin.v8i3.46723
Primary Topic
Advanced Manufacturing and Logistics Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Relayout Lantai Produksi Tenda Guna Meminimasi Jarak Perpindahan Material

Devin Agni Berlian, Putu Eka Dewi Karunia Wati
Jurnal Teknik Industri Terintegrasi
Advanced Manufacturing and Logistics Optimization
article

Relayout Lantai Produksi Tenda Guna Meminimasi Jarak Perpindahan Material

Devin Agni Berlian, Putu Eka Dewi Karunia Wati
article en

Abstract

CV. XYZ is a tent manufacturing company based in Surabaya facing issues with its production facility layout, which does not follow the actual production flow. This results in long material handling distances and inefficient workflow. This study aims to redesign the layout to minimize material movement distances and optimize space utilization. The methods used include observation, interviews, the creation of an Operation Process Chart, Multi Product Process Chart, From-To Chart, Systematic Layout Planning analysis, and simulation using FlexSim software. The research sample includes all workstations on the production floor of CV. XYZ. The results show that proposed layout 2 reduces the Material Handling burden by 29.01% and increases space utilization from 46.52 m² to 88.55 m². It is recommended that the company implement the proposed layout to enhance production efficiency.

Jurnal Teknik Industri TerintegrasiVol. 8(3)
Universitas 17 Agustus 1945 Surabaya (ID)
Openalex Percentile: Top 76%
Advanced Manufacturing and Logistics Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.