Analisis Peramalan dengan Metode Moving Average dan Exponential Smoothing dalam Perencanaan dan Pengendalian Produksi Pabrik Tempe Jombang

Production planning and control are essential aspects in ensuring smooth production processes, creating profitable products, and making sure products are available on time. The home industry for tempeh production located in Link. Jombang Kali, Jombang District, has been operating since 1993 and continues to this day. However, this tempeh factory often experiences fluctuations in production, including both overproduction and underproduction. Therefore, a study was conducted to evaluate and forecast the production levels for upcoming periods. Forecasting errors were evaluated using Mean Absolute Deviation (MAD), Mean Squared Error (MSE), and Mean Absolute Percent Error (MAPE). The purpose of this study is to compare the Moving Average and Exponential Smoothing methods. The results of the analysis show that the Exponential Smoothing method produces lower error values, with MAD of 387.163, MSE of 261,914.1, and MAPE of 0.055349, compared to the Moving Average method.

Authors

Institutions

Publication Details

Journal
Jurnal Teknik Industri Terintegrasi
Published
2025-07-04
DOI
https://doi.org/10.31004/jutin.v8i3.47312
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analisis Peramalan dengan Metode Moving Average dan Exponential Smoothing dalam Perencanaan dan Pengendalian Produksi Pabrik Tempe Jombang

Aulia Kusumawati, Bernard Jorgi, Zaki Agung Prabowo, M Iqbal Ibrahim Hamdani et al.
Jurnal Teknik Industri Terintegrasi
Management and Optimization Techniques
article

Analisis Peramalan dengan Metode Moving Average dan Exponential Smoothing dalam Perencanaan dan Pengendalian Produksi Pabrik Tempe Jombang

Aulia Kusumawati, Bernard Jorgi, Zaki Agung Prabowo, M Iqbal Ibrahim Hamdani, I Gusti Putu Setya Gandhi, Ahmad Reza Nugraha
article en

Abstract

Production planning and control are essential aspects in ensuring smooth production processes, creating profitable products, and making sure products are available on time. The home industry for tempeh production located in Link. Jombang Kali, Jombang District, has been operating since 1993 and continues to this day. However, this tempeh factory often experiences fluctuations in production, including both overproduction and underproduction. Therefore, a study was conducted to evaluate and forecast the production levels for upcoming periods. Forecasting errors were evaluated using Mean Absolute Deviation (MAD), Mean Squared Error (MSE), and Mean Absolute Percent Error (MAPE). The purpose of this study is to compare the Moving Average and Exponential Smoothing methods. The results of the analysis show that the Exponential Smoothing method produces lower error values, with MAD of 387.163, MSE of 261,914.1, and MAPE of 0.055349, compared to the Moving Average method.

Jurnal Teknik Industri TerintegrasiVol. 8(3)
Serang Raya University (ID)
Openalex Percentile: Top 74%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.