Pengoptimalan Produksi pada Pembuatan Rak Piring Berdasarkan Studi Waktu Kerja

UD Yurike, a furniture company in Surabaya, the production process in this company is constrained by the absence of a standard time to complete one unit of plate rack. This led to the absence of a target number of units to be completed by each worker per day. This condition has an impact on the difficulty of achieving targets in the midst of fluctuating demand and the manual assembly process. The purpose of this research is to understand the standard time to complete one unit of plate rack and the labor requirements per division using the Stopwatch Time Study method. The results of data processing show that the amount of standard time needed to complete one unit of plate rack is 1967.11 seconds (equivalent to 32.79 minutes), with additional labor requirements for the pipe frame coloring division to 2 workers and wire frame coloring to 4 workers and other.

Authors

Institutions

Publication Details

Journal
Jurnal Teknik Industri Terintegrasi
Published
2025-07-04
DOI
https://doi.org/10.31004/jutin.v8i3.46427
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Pengoptimalan Produksi pada Pembuatan Rak Piring Berdasarkan Studi Waktu Kerja

Izudien Fahmi, Erni Puspanantasari Putri
Jurnal Teknik Industri Terintegrasi
Management and Optimization Techniques
article

Pengoptimalan Produksi pada Pembuatan Rak Piring Berdasarkan Studi Waktu Kerja

Izudien Fahmi, Erni Puspanantasari Putri
article en

Abstract

UD Yurike, a furniture company in Surabaya, the production process in this company is constrained by the absence of a standard time to complete one unit of plate rack. This led to the absence of a target number of units to be completed by each worker per day. This condition has an impact on the difficulty of achieving targets in the midst of fluctuating demand and the manual assembly process. The purpose of this research is to understand the standard time to complete one unit of plate rack and the labor requirements per division using the Stopwatch Time Study method. The results of data processing show that the amount of standard time needed to complete one unit of plate rack is 1967.11 seconds (equivalent to 32.79 minutes), with additional labor requirements for the pipe frame coloring division to 2 workers and wire frame coloring to 4 workers and other.

Jurnal Teknik Industri TerintegrasiVol. 8(3)
Universitas 17 Agustus 1945 Surabaya (ID)
Openalex Percentile: Top 74%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.