Evaluasi Kinerja Mesin Circular Loom Guna Mengurangi Defect Produk dengan Metode Six Sigma

PT. XYZ experienced a high level of defects in woven bag products, with a total of 846,929 defective units from 6,305,102 production units during January - May 2025. The dominant types of defects were keperet, loose knitting, perforated knitting, and insulation joints. This study aims to evaluate the performance of the Circular Loom machine to reduce defects using the Six Sigma method through the DMAIC approach. The analysis was carried out using Pareto diagrams, p control charts, DPMO calculations, and sigma levels. The calculation results showed that the Defect Per Million Opportunity (DPMO) value in the Wovenbag production process at PT.XYZ during the January - May 2025 period reached an average of (33,581), with the types of defects Keperet (38.515), Loose Knitting (32.987), Knitting Holes (30.711), and Insulation Joints (32.112), then the average Sigma Level (3.332) with the types of defects Keperet (3.268), Loose Knitting (3.339), Knitting Holes (3.370) and Insulation Joints (3.351). Average Process Capability (1.111) with the types of defects Keperet (1.089), Loose Knitting (1.113), Knitting Holes (1.123) and Insulation Joints (1.117).

Authors

Institutions

Publication Details

Journal
Jurnal Teknik Industri Terintegrasi
Published
2025-07-04
DOI
https://doi.org/10.31004/jutin.v8i3.46740
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Evaluasi Kinerja Mesin Circular Loom Guna Mengurangi Defect Produk dengan Metode Six Sigma

Jaka Purnama, Randy Alwan Nafis
Jurnal Teknik Industri Terintegrasi
Management and Optimization Techniques
article

Evaluasi Kinerja Mesin Circular Loom Guna Mengurangi Defect Produk dengan Metode Six Sigma

Jaka Purnama, Randy Alwan Nafis
article en

Abstract

PT. XYZ experienced a high level of defects in woven bag products, with a total of 846,929 defective units from 6,305,102 production units during January - May 2025. The dominant types of defects were keperet, loose knitting, perforated knitting, and insulation joints. This study aims to evaluate the performance of the Circular Loom machine to reduce defects using the Six Sigma method through the DMAIC approach. The analysis was carried out using Pareto diagrams, p control charts, DPMO calculations, and sigma levels. The calculation results showed that the Defect Per Million Opportunity (DPMO) value in the Wovenbag production process at PT.XYZ during the January - May 2025 period reached an average of (33,581), with the types of defects Keperet (38.515), Loose Knitting (32.987), Knitting Holes (30.711), and Insulation Joints (32.112), then the average Sigma Level (3.332) with the types of defects Keperet (3.268), Loose Knitting (3.339), Knitting Holes (3.370) and Insulation Joints (3.351). Average Process Capability (1.111) with the types of defects Keperet (1.089), Loose Knitting (1.113), Knitting Holes (1.123) and Insulation Joints (1.117).

Jurnal Teknik Industri TerintegrasiVol. 8(3)
Universitas 17 Agustus 1945 Surabaya (ID)
Openalex Percentile: Top 74%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.