Perencanaan Pengendalian Bahan Baku Pembuatan Standar Motor, Bastep Motor, dan Stang Motor (Studi Kasus: UD. X)

This research aims to develop a systematic raw material planning and control strategy for the production of three motorcycle components—center stands, footrests (bastep), and handlebars—at UD KS Pro, in order to minimize inventory costs and prevent both shortages and excess of raw materials. The company currently faces inefficiencies in managing raw materials, particularly iron pipes and iron plates, due to the absence of a structured planning method. This study employs a Material Requirement Planning (MRP) approach using historical demand data, the Master Production Schedule (MPS), and the Bill of Materials (BOM). The analysis process includes demand forecasting using the Moving Average method, calculating net material requirements, determining safety stock, reorder points, and lot sizing. The results show that implementing MRP helps the company optimize order quantities, reduce stock imbalance risks, and improve both cost efficiency and production continuity. This research is expected to serve as a reference for UD KS Pro in making more accurate and structured inventory management decisions.

Authors

Institutions

Publication Details

Journal
Jurnal Teknik Industri Terintegrasi
Published
2025-07-04
DOI
https://doi.org/10.31004/jutin.v8i3.46492
Primary Topic
Material Selection and Properties
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Perencanaan Pengendalian Bahan Baku Pembuatan Standar Motor, Bastep Motor, dan Stang Motor (Studi Kasus: UD. X)

Putra Riski Rendragraha, Siti Mundari
Jurnal Teknik Industri Terintegrasi
Material Selection and Properties
article

Perencanaan Pengendalian Bahan Baku Pembuatan Standar Motor, Bastep Motor, dan Stang Motor (Studi Kasus: UD. X)

Putra Riski Rendragraha, Siti Mundari
article en

Abstract

This research aims to develop a systematic raw material planning and control strategy for the production of three motorcycle components—center stands, footrests (bastep), and handlebars—at UD KS Pro, in order to minimize inventory costs and prevent both shortages and excess of raw materials. The company currently faces inefficiencies in managing raw materials, particularly iron pipes and iron plates, due to the absence of a structured planning method. This study employs a Material Requirement Planning (MRP) approach using historical demand data, the Master Production Schedule (MPS), and the Bill of Materials (BOM). The analysis process includes demand forecasting using the Moving Average method, calculating net material requirements, determining safety stock, reorder points, and lot sizing. The results show that implementing MRP helps the company optimize order quantities, reduce stock imbalance risks, and improve both cost efficiency and production continuity. This research is expected to serve as a reference for UD KS Pro in making more accurate and structured inventory management decisions.

Jurnal Teknik Industri TerintegrasiVol. 8(3)
Universitas 17 Agustus 1945 Surabaya (ID)
Openalex Percentile: Top 88%
Material Selection and Properties
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Perencanaan Pengendalian Bahan Baku Pembuatan Standar Motor, Bastep Motor, dan Stang Motor (Studi Kasus: UD. X) — Putra Riski Rendragraha, Siti Mundari · Jurnal Teknik Industri Terintegrasi (2025) | TGRS Research Map | TGRS