Analisis Maintenance pada Mesin Forming Menggunakan Metode Reliability Centered Maintenance di PT. Refindo Intiselaras

This research was conducted at PT. XYZ which is engaged in manufacturing, with a focus on forming machines. The purpose of this study was to analyze the maintenance system of forming machines using the Reliability Centered Maintenance (RCM) method, in order to improve machine reliability and reduce the frequency of damage. The results of the analysis showed that the bearing component had the highest RPN value of 224. The MTTF on the bearing machine was 312.39 hours. While the MTTR result was 213.2143. From these results, PT XYZ needs to conduct inspections about 1 month 2 times to increase the operational level of the forming machine, the addition of lubricants is also needed to reduce the frequency of failure in the bearing forming machine.

Authors

Institutions

Publication Details

Journal
Jurnal Teknik Industri Terintegrasi
Published
2025-07-04
DOI
https://doi.org/10.31004/jutin.v8i3.46891
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analisis Maintenance pada Mesin Forming Menggunakan Metode Reliability Centered Maintenance di PT. Refindo Intiselaras

Aan Zainal Muttaqin, Doni Susanto, Agun Syahrul Frastyansyah
1 links
Jurnal Teknik Industri Terintegrasi
Management and Optimization Techniques
article

Analisis Maintenance pada Mesin Forming Menggunakan Metode Reliability Centered Maintenance di PT. Refindo Intiselaras

Aan Zainal Muttaqin, Doni Susanto, Agun Syahrul Frastyansyah
article en

Abstract

This research was conducted at PT. XYZ which is engaged in manufacturing, with a focus on forming machines. The purpose of this study was to analyze the maintenance system of forming machines using the Reliability Centered Maintenance (RCM) method, in order to improve machine reliability and reduce the frequency of damage. The results of the analysis showed that the bearing component had the highest RPN value of 224. The MTTF on the bearing machine was 312.39 hours. While the MTTR result was 213.2143. From these results, PT XYZ needs to conduct inspections about 1 month 2 times to increase the operational level of the forming machine, the addition of lubricants is also needed to reduce the frequency of failure in the bearing forming machine.

Jurnal Teknik Industri TerintegrasiVol. 8(3)
Universitas PGRI Madiun (ID)
Openalex Percentile: Top 74%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.