Analysis of Factory Operational Scheme Using Decision Tree Method with C4.5 Algorithm

Optimizing the utilization of idle industrial assets is a crucial issue in asset-based management strategies, especially in the high-risk and capital-intensive petrochemical sector. PT Pupuk Iskandar Muda (PT PIM) as part of the development of the Arun Lhokseumawe Special Economic Zone (SEZ), is faced with the urgency to determine the most rational and value-added operational scheme in reactivating the ex-PT AAF Hydrogen Peroxide (H?O?) Factory. There are three alternative schemes analysed in this context: lease, operating cooperation (KSO) and self-management, each of which has different financial characteristics and risk profiles. The complexity of such decision-making requires a data-driven approach that is able to integrate economic and risk aspects holistically. This study aims to determine the most feasible operational scheme based on economic indicators such as Net Present Value (NPV), Internal Rate of Return (IRR) and Payback Period (PP), as well as two main risk dimensions, namely operational risk and market risk. This study also aims to build a decision tree-based decision-making model using the C4.5 algorithm to classify the feasibility of the scheme in a systematic and transparent manner. The research method uses a descriptive-analytical quantitative approach. The data used are secondary data from the project feasibility study and PT PIM's internal documents. Modeling was carried out by processing six main variables in categorical form to form a decision tree structure through the C4.5 algorithm. The process starts from calculating the entropy value, gain, to determining the root node and branch of the decision. The classification results show that market risk is the most decisive attribute in the decision-making process, followed by NPV as the main separating indicator between the "Feasible" and "Very Feasible" feasibility levels. The main findings of this study are that the self-management scheme is the most feasible option with the best financial performance: NPV of ±Rp 38.77 billion, IRR of 14.48%, and Payback Period of 5.58 years. The structure of the established decision tree is able to explicitly describe how the combination of risk and financial indicators can lead to different final decisions. This model serves not only as a classification tool, but also as an analytical instrument in understanding the relationships between variables and their implications for investment feasibility. This research makes a methodological contribution to the application of the C4.5 algorithm for data-driven strategic decision-making. This approach has been proven to improve accuracy, objectivity, and transparency in assessing the operational feasibility of industrial assets, and can be replicated for similar cases in other sectors.

Authors

Institutions

Publication Details

Journal
Enrichment Journal of Multidisciplinary Research and Development
Published
2025-07-16
DOI
https://doi.org/10.55324/enrichment.v3i4.420
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of Factory Operational Scheme Using Decision Tree Method with C4.5 Algorithm

Yuwaldi Away, Irwansyah Irwansyah, Hendra Muzawwir
1 links
Enrichment Journal of Multidisciplinary Research and Development
Scheduling and Optimization Algorithms
article

Analysis of Factory Operational Scheme Using Decision Tree Method with C4.5 Algorithm

Yuwaldi Away, Irwansyah Irwansyah, Hendra Muzawwir
article en

Abstract

Optimizing the utilization of idle industrial assets is a crucial issue in asset-based management strategies, especially in the high-risk and capital-intensive petrochemical sector. PT Pupuk Iskandar Muda (PT PIM) as part of the development of the Arun Lhokseumawe Special Economic Zone (SEZ), is faced with the urgency to determine the most rational and value-added operational scheme in reactivating the ex-PT AAF Hydrogen Peroxide (H?O?) Factory. There are three alternative schemes analysed in this context: lease, operating cooperation (KSO) and self-management, each of which has different financial characteristics and risk profiles. The complexity of such decision-making requires a data-driven approach that is able to integrate economic and risk aspects holistically. This study aims to determine the most feasible operational scheme based on economic indicators such as Net Present Value (NPV), Internal Rate of Return (IRR) and Payback Period (PP), as well as two main risk dimensions, namely operational risk and market risk. This study also aims to build a decision tree-based decision-making model using the C4.5 algorithm to classify the feasibility of the scheme in a systematic and transparent manner. The research method uses a descriptive-analytical quantitative approach. The data used are secondary data from the project feasibility study and PT PIM's internal documents. Modeling was carried out by processing six main variables in categorical form to form a decision tree structure through the C4.5 algorithm. The process starts from calculating the entropy value, gain, to determining the root node and branch of the decision. The classification results show that market risk is the most decisive attribute in the decision-making process, followed by NPV as the main separating indicator between the "Feasible" and "Very Feasible" feasibility levels. The main findings of this study are that the self-management scheme is the most feasible option with the best financial performance: NPV of ±Rp 38.77 billion, IRR of 14.48%, and Payback Period of 5.58 years. The structure of the established decision tree is able to explicitly describe how the combination of risk and financial indicators can lead to different final decisions. This model serves not only as a classification tool, but also as an analytical instrument in understanding the relationships between variables and their implications for investment feasibility. This research makes a methodological contribution to the application of the C4.5 algorithm for data-driven strategic decision-making. This approach has been proven to improve accuracy, objectivity, and transparency in assessing the operational feasibility of industrial assets, and can be replicated for similar cases in other sectors.

Enrichment Journal of Multidisciplinary Research and DevelopmentVol. 3(4)
Universitas Syiah Kuala (ID)
Openalex Percentile: Top 76%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.