Analysis of Factors Affecting Labor Productivity in Drainage Channel Rehabilitation Project in Ubud District

In managing the use of labor effectively, contractors must understand worker productivity. Labor productivity is an important factor in the efficiency of a construction project and can have a significant impact on project performance. This study aims to assess the effective, ineffective, and contributing working time of the Drainage Rehabilitation Project in Ubud Regency and to identify the factors that affect the productivity of the workforce on this project. The methodology used was productivity ratings, which were categorized into three groups: effective working time, contributory working time, and ineffective working time. The results showed that during the five days of observation, effective working time amounted to 83 hours and 6 minutes, ineffective working time was 22 hours and 20 minutes, and contributory work time was only 5 hours and 36 minutes. Key factors that affect productivity include working hours and labor behavior, such as being late, ineffective time spent smoking, conversing with coworkers, and leaving work zones. In addition, productivity decreased on Fridays due to shorter working hours related to religious observance, resulting in an average project productivity of only 72.58%.

Authors

Institutions

Publication Details

Journal
Formosa Journal of Multidisciplinary Research
Published
2025-06-20
DOI
https://doi.org/10.55927/fjmr.v4i6.153
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of Factors Affecting Labor Productivity in Drainage Channel Rehabilitation Project in Ubud District

Anak Agung Gde Agung Yana, I Wayan Sutama, I Nyoman Tirta Ariana, Ngakan Made Anom Wiryasa et al.
Formosa Journal of Multidisciplinary Research
Management and Optimization Techniques
article

Analysis of Factors Affecting Labor Productivity in Drainage Channel Rehabilitation Project in Ubud District

Anak Agung Gde Agung Yana, I Wayan Sutama, I Nyoman Tirta Ariana, Ngakan Made Anom Wiryasa, Ngakan Ketut Acwin Dwijendra, Ketut Dayuh
article en

Abstract

In managing the use of labor effectively, contractors must understand worker productivity. Labor productivity is an important factor in the efficiency of a construction project and can have a significant impact on project performance. This study aims to assess the effective, ineffective, and contributing working time of the Drainage Rehabilitation Project in Ubud Regency and to identify the factors that affect the productivity of the workforce on this project. The methodology used was productivity ratings, which were categorized into three groups: effective working time, contributory working time, and ineffective working time. The results showed that during the five days of observation, effective working time amounted to 83 hours and 6 minutes, ineffective working time was 22 hours and 20 minutes, and contributory work time was only 5 hours and 36 minutes. Key factors that affect productivity include working hours and labor behavior, such as being late, ineffective time spent smoking, conversing with coworkers, and leaving work zones. In addition, productivity decreased on Fridays due to shorter working hours related to religious observance, resulting in an average project productivity of only 72.58%.

Formosa Journal of Multidisciplinary ResearchVol. 4(6)
Udayana University (ID), University of National Education (ID)
Openalex Percentile: Top 74%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analysis of Factors Affecting Labor Productivity in Drainage Channel Rehabilitation Project in Ubud District — Anak Agung Gde Agung Yana, I Wayan Sutama, et al. · Formosa Journal of Multidisciplinary Research (2025) | TGRS Research Map | TGRS