ANALISIS PENGARUH KETERLAMBATAN PENYELESAIAN PROYEK KONSTRUKSI DENGAN MENGGUNAKAN METODE EARNED VALUE

Construction Project is an activity carried out with limited time and resources to achieve the specified end result. In the implementation of a Construction Project, delays often occur where the actual progress of the realization obtained does not match the planned progress. So that it can affect the costs that have been budgeted. This research was conducted at Tompotika University Luwuk Banggai Jl. Dewi Sartika No. 67 Kelurahan Luwuk, Banggai Regency, Central Sulawesi Province. This study aims to determine the factors that cause delays in the project, as well as the impact of the influence of delays on costs in the Addition of the Second Floor Building Project of Tompotika University Luwuk Banggai. The method used in this study is descriptive quantitative, with the analysis tool used is Earned Value (EV) or Result Value. The results of the study indicate that the main factors causing delays in the Second Floor Building Addition Project of Tompotika University Luwuk Banggai are the implementation of the planned project scheduling is not good, so that the weight of the work realization in the field is not able to reach the weight of the work that has been planned. After conducting an analysis using the Earned Value (EV) method, in the calculation of basic indicators, as well as the calculation of the combination of variance values and performance indexes, it was found that the Second Floor Building Addition Project of Tompotika University Luwuk Banggai, incurred more wasteful actual costs (Over Cost) in the 1st week, which was Rp 17,714,858.82 from the realized cost of Rp 17,699,315.67 with a difference = -15,507.15. However, in the 2nd week to the 16th week, the costs incurred were more economical, namely Rp1,949,701,273.09 from the realization cost of Rp1,957,340,068.05 with a difference = 7,638,794.69. Meanwhile, the project schedule experienced a total delay from week 1 to week 16.

Authors

Institutions

Publication Details

Journal
SIPARSTIKA Jurnal Ilmiah Ilmu-Ilmu Teknik
Published
2025-05-31
DOI
https://doi.org/10.55114/siparstika.v4i2.919
Primary Topic
Value Engineering and Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

ANALISIS PENGARUH KETERLAMBATAN PENYELESAIAN PROYEK KONSTRUKSI DENGAN MENGGUNAKAN METODE EARNED VALUE

Sri Susilawati, Putu Suartana, Komang Okayana
SIPARSTIKA Jurnal Ilmiah Ilmu-Ilmu Teknik
Value Engineering and Management
article

ANALISIS PENGARUH KETERLAMBATAN PENYELESAIAN PROYEK KONSTRUKSI DENGAN MENGGUNAKAN METODE EARNED VALUE

Sri Susilawati, Putu Suartana, Komang Okayana
article en

Abstract

Construction Project is an activity carried out with limited time and resources to achieve the specified end result. In the implementation of a Construction Project, delays often occur where the actual progress of the realization obtained does not match the planned progress. So that it can affect the costs that have been budgeted. This research was conducted at Tompotika University Luwuk Banggai Jl. Dewi Sartika No. 67 Kelurahan Luwuk, Banggai Regency, Central Sulawesi Province. This study aims to determine the factors that cause delays in the project, as well as the impact of the influence of delays on costs in the Addition of the Second Floor Building Project of Tompotika University Luwuk Banggai. The method used in this study is descriptive quantitative, with the analysis tool used is Earned Value (EV) or Result Value. The results of the study indicate that the main factors causing delays in the Second Floor Building Addition Project of Tompotika University Luwuk Banggai are the implementation of the planned project scheduling is not good, so that the weight of the work realization in the field is not able to reach the weight of the work that has been planned. After conducting an analysis using the Earned Value (EV) method, in the calculation of basic indicators, as well as the calculation of the combination of variance values and performance indexes, it was found that the Second Floor Building Addition Project of Tompotika University Luwuk Banggai, incurred more wasteful actual costs (Over Cost) in the 1st week, which was Rp 17,714,858.82 from the realized cost of Rp 17,699,315.67 with a difference = -15,507.15. However, in the 2nd week to the 16th week, the costs incurred were more economical, namely Rp1,949,701,273.09 from the realization cost of Rp1,957,340,068.05 with a difference = 7,638,794.69. Meanwhile, the project schedule experienced a total delay from week 1 to week 16.

SIPARSTIKA Jurnal Ilmiah Ilmu-Ilmu TeknikVol. 4(2)
Universitas Tompotika Luwuk (ID)
Openalex Percentile: Top 74%
Value Engineering and Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

ANALISIS PENGARUH KETERLAMBATAN PENYELESAIAN PROYEK KONSTRUKSI DENGAN MENGGUNAKAN METODE EARNED VALUE — Sri Susilawati, Putu Suartana, et al. · SIPARSTIKA Jurnal Ilmiah Ilmu-Ilmu Teknik (2025) | TGRS Research Map | TGRS