Enhancing Transformer Maintenance with Predictive Analytics: A Cost-Effective and Reliable Solution using Machine Learning

Transformer monitoring is traditionally carried out by manual inspections and cyclical assessments that have led to costly maintenance, unscheduled outages, and delayed interventions. The proposed system improves transformer maintenance using predictive analytics powered by machine learning (ML). It differs from traditional systems by anticipating breakdowns in advance using real-time data from sensors tracking multiple parameters including temperature, vibration, load, and oil quality. Maintenance savings achieved through the technique amount to 92% prediction accuracy, 88% precision, and 85% recall compared to 78%-85% accuracy and 70%-80% precision in existing systems. Annual total expenditures are reduced from $500,000-$700,000 in existing systems to $370,000. Downtime caused by maintenance is reduced from 120 hours to 40 hours annually, increasing reliability to 95%. The system shows an effective improvement in both the cost and efficiency of transformer maintenance.

Authors

Institutions

Publication Details

Published
2024-12-13
DOI
https://doi.org/10.1109/sustained63638.2024.11073993
Primary Topic
Power Transformer Diagnostics and Insulation
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Enhancing Transformer Maintenance with Predictive Analytics: A Cost-Effective and Reliable Solution using Machine Learning

S. Suganya, S. Jayasankari, C. Gunasundari, S. Navaneethan et al.
2 links
Power Transformer Diagnostics and Insulation
article

Enhancing Transformer Maintenance with Predictive Analytics: A Cost-Effective and Reliable Solution using Machine Learning

S. Suganya, S. Jayasankari, C. Gunasundari, S. Navaneethan, Thenappan Chandrasekar, Thatikonda Radhika
article en

Abstract

Transformer monitoring is traditionally carried out by manual inspections and cyclical assessments that have led to costly maintenance, unscheduled outages, and delayed interventions. The proposed system improves transformer maintenance using predictive analytics powered by machine learning (ML). It differs from traditional systems by anticipating breakdowns in advance using real-time data from sensors tracking multiple parameters including temperature, vibration, load, and oil quality. Maintenance savings achieved through the technique amount to 92% prediction accuracy, 88% precision, and 85% recall compared to 78%-85% accuracy and 70%-80% precision in existing systems. Annual total expenditures are reduced from $500,000-$700,000 in existing systems to $370,000. Downtime caused by maintenance is reduced from 120 hours to 40 hours annually, increasing reliability to 95%. The system shows an effective improvement in both the cost and efficiency of transformer maintenance.

SRM Institute of Science and Technology (IN), ASA College (US), P.V. Narsimha Rao Telangana Veterinary University (IN), Velammal Medical College Hospital and Research Institute (IN), Saveetha University (IN), SASTRA University (IN)
Openalex Percentile: Top 72%
Power Transformer Diagnostics and Insulation
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.