Investigating The Drivers of Cost and Schedule Performance in Ghana's Road Construction

ABSTRACT Purpose: This study investigates the extent of contract cost and timeline overruns in Ghana’s road construction sector by analysing historical data from feeder road projects. It seeks to determine whether project type, size, and duration influence cost and schedule overruns. Design/Methodology/Approach: The study employs a quantitative research approach using archival data. A census sampling technique was used to select 156 feeder road projects in Northern Ghana based on the availability of reliable data. Projects from 2019 to 2020 were chosen due to consistent documentation and to avoid political bias, ensuring a sufficient sample for statistical analysis. This approach enhanced the study’s reliability and the applicability of its findings on cost and time overruns. Findings: The findings confirm that cost and schedule overruns vary significantly across project types, sizes, and durations. Routine maintenance projects exhibited minimal overruns, whereas bitumen surfacing and rehabilitation projects experienced substantial cost and timeline overruns. Larger and longer-duration projects had higher overruns compared to smaller and shorter-term projects. Research Limitation: The study focuses on feeder road projects within a specific geographic region and timeframe, limiting the generalizability of its findings to other construction sectors. Future research should examine a broader range of projects and include qualitative insights into the causes of overruns. Practical Implication: The study provides empirical evidence that can guide policymakers, contractors, and project managers in implementing measures to reduce cost and timeline overruns. Social Implication: Addressing cost and time overruns can lead to better resource allocation and timely project completion, benefiting local communities and stakeholders. Originality/Value: The introduction of project typology as a performance factor, along with the suggestion of contractor classification as a future variable, adds originality and depth.

Authors

Institutions

Publication Details

Journal
African Journal Of Applied Research
Published
2025-07-13
DOI
https://doi.org/10.26437/ajar.v11i3.1134
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Investigating The Drivers of Cost and Schedule Performance in Ghana's Road Construction

E. K. Afetorgbor, Eric Kodzo Adzivor, George Harrison Coffie, Herbert Abeka
African Journal Of Applied Research
Construction Project Management and Performance
article

Investigating The Drivers of Cost and Schedule Performance in Ghana's Road Construction

E. K. Afetorgbor, Eric Kodzo Adzivor, George Harrison Coffie, Herbert Abeka
article en

Abstract

ABSTRACT Purpose: This study investigates the extent of contract cost and timeline overruns in Ghana’s road construction sector by analysing historical data from feeder road projects. It seeks to determine whether project type, size, and duration influence cost and schedule overruns. Design/Methodology/Approach: The study employs a quantitative research approach using archival data. A census sampling technique was used to select 156 feeder road projects in Northern Ghana based on the availability of reliable data. Projects from 2019 to 2020 were chosen due to consistent documentation and to avoid political bias, ensuring a sufficient sample for statistical analysis. This approach enhanced the study’s reliability and the applicability of its findings on cost and time overruns. Findings: The findings confirm that cost and schedule overruns vary significantly across project types, sizes, and durations. Routine maintenance projects exhibited minimal overruns, whereas bitumen surfacing and rehabilitation projects experienced substantial cost and timeline overruns. Larger and longer-duration projects had higher overruns compared to smaller and shorter-term projects. Research Limitation: The study focuses on feeder road projects within a specific geographic region and timeframe, limiting the generalizability of its findings to other construction sectors. Future research should examine a broader range of projects and include qualitative insights into the causes of overruns. Practical Implication: The study provides empirical evidence that can guide policymakers, contractors, and project managers in implementing measures to reduce cost and timeline overruns. Social Implication: Addressing cost and time overruns can lead to better resource allocation and timely project completion, benefiting local communities and stakeholders. Originality/Value: The introduction of project typology as a performance factor, along with the suggestion of contractor classification as a future variable, adds originality and depth.

African Journal Of Applied ResearchVol. 11(3)
Ho Technical University (GH), Sunyani Technical University (GH)
Openalex Percentile: Top 80%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.