Handling of Sticky Coal During the Process of Unloading Coal from the Wagon at Kertapati Port

Coal unloading operations at Kertapati Port face persistent inefficiencies due to the adhesive nature of low-rank coal, which frequently sticks to the inner surfaces of train carriages, causing delays, increased operational costs, and reduced unloading performance. This study aims to formulate a feasible and effective strategy to mitigate the issue of sticky coal during the unloading process to support the achievement of production and transportation targets. Using a mixed-methods approach, the study integrates the Current Reality Tree (CRT) to identify root operational bottlenecks, the Analytic Hierarchy Process (AHP) to prioritize technical solutions, the Critical Path Method (CPM) and PERT for project scheduling, and financial feasibility analysis through NPV, IRR, and Payback Period. The results indicate that applying a stainles steel lining to the interior of boat-type train carriages is the most effective solution to reduce coal adhesion. Financially, the proposed investment is attractive, yielding an IRR of 66%, an NPV of IDR 29.1 billion, and a payback period of two years. The project is scheduled to begin on August 1, 2025, and complete by November 14, 2025. Continuous risk management measures are also planned throughout implementation. This integrated solution not only addresses the immediate operational inefficiencies but also supports long-term improvements in coal handling reliability and port logistics performance.

Authors

Institutions

Publication Details

Journal
INOVASI
Published
2025-07-14
DOI
https://doi.org/10.32493/inovasi.v12i1.p384-393.51688
Primary Topic
Mineral Processing and Grinding
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Handling of Sticky Coal During the Process of Unloading Coal from the Wagon at Kertapati Port

Akbar Adhi Utama, Bayu Pramana Afin
INOVASI
Mineral Processing and Grinding
article

Handling of Sticky Coal During the Process of Unloading Coal from the Wagon at Kertapati Port

Akbar Adhi Utama, Bayu Pramana Afin
article en

Abstract

Coal unloading operations at Kertapati Port face persistent inefficiencies due to the adhesive nature of low-rank coal, which frequently sticks to the inner surfaces of train carriages, causing delays, increased operational costs, and reduced unloading performance. This study aims to formulate a feasible and effective strategy to mitigate the issue of sticky coal during the unloading process to support the achievement of production and transportation targets. Using a mixed-methods approach, the study integrates the Current Reality Tree (CRT) to identify root operational bottlenecks, the Analytic Hierarchy Process (AHP) to prioritize technical solutions, the Critical Path Method (CPM) and PERT for project scheduling, and financial feasibility analysis through NPV, IRR, and Payback Period. The results indicate that applying a stainles steel lining to the interior of boat-type train carriages is the most effective solution to reduce coal adhesion. Financially, the proposed investment is attractive, yielding an IRR of 66%, an NPV of IDR 29.1 billion, and a payback period of two years. The project is scheduled to begin on August 1, 2025, and complete by November 14, 2025. Continuous risk management measures are also planned throughout implementation. This integrated solution not only addresses the immediate operational inefficiencies but also supports long-term improvements in coal handling reliability and port logistics performance.

INOVASIVol. 12(1)
Bandung Institute of Technology (ID)
Openalex Percentile: Top 83%
Mineral Processing and Grinding
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.